Laserfiche WebLink
• • <br /> Task 1: Describe the project during construction <br /> IINature and purpose of the construction project: <br /> Installing Electrical vehicle charging in the existing parking lot. <br /> Adjacent areas,including streams,lakes,wetlands,residential areas,and roads that <br /> might be affected by the construction project: <br /> Surrounding parking lot and nearby road (SE Everett Mall Way). <br /> How upstream drainage areas may affect the site: <br /> Minimal impacts from upstream drainage. <br /> Downstream drainage leading from the site to a receiving body of water: <br /> Site within North Creek Drainage Basin. <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> N/A <br /> Special requirements and provisions for working near or within critical areas: <br /> Site not located in a critical area. , <br /> Areas on the site that have potential erosion problems: <br /> No areas of potential erosion problems. <br /> Locations where surface water leaves the site: <br /> Existing catch basin located immediately south of project disturbance area. ' <br /> City of Everett Public Works <br /> Construction Stormwater Pollution Prevention Plan 2 of 6 <br /> (SWPPP)Template for Small Projects <br />