Laserfiche WebLink
• • <br /> Task 2: Select Construction Best Management Practices (BMPs) to be used on your project <br /> All new development and redevelopment projects are responsibleforpreventingerosion and sedimentation <br /> duringconstruction.Each ofthe 13 requirements below contains a list of Best Management Practices(BMPs) <br /> that are accepted by the Washington State Departmentof Ecology(Ecology)forsatisfyingeach requirement. <br /> The BMPs below are the most common.For a complete selection of BMPs please see Volume II of Ecology's <br /> Stormwater Management Manual for Western Washington. <br /> 0 Each of the 13 Elements below must be considered in the SWPPP. Select all <br /> BMPsthatyou will be usingto satisfy each requirement.All requirements must <br /> have at least one item selected. <br /> Element 1. Preserve vegetation/mark clearing limits: <br /> I] BMP C101:Preserving Natural Vegetation <br /> ❑ BMP C102: Buffer Zones <br /> E BMP C103: High Visibility Plastic or Metal Fence <br /> ❑ Other PertheSWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> Element 2. Establish construction: <br /> El BMP C105:Stabilized Construction Entrance/Exit <br /> ❑ BMP C106:Wheel Wash <br /> ❑ BMP C107:Construction Road/Parking Area Stabilization <br /> ❑ Other perthesWMM WW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> Element 3. Control flow rates: <br /> ❑ BMP C203:Water Bars <br /> ❑ BMP C240:Sediment Trap <br /> ❑ BMP C241:TemporarySediment Pond <br /> ❑ OtherPertheSWMMWW: BPM C235:Wattles <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> City of Everett Public Works <br /> Construction Stormwater Pollution Prevention Plan 3 of 6 <br /> (SWPPP) Template for Small Projects <br />