Laserfiche WebLink
, 1 <br /> jr) <br /> (( <br /> Task 3: Attach Project Specific Stormwater Site Plan (required) <br /> � See City of Everett standard drawings #100-104 for stormwater site plan requirements and <br /> examples, including a Temporary Erosion & Sediment Control (TESC) plan example and <br /> drainage plan example, available online at: <br /> everettwa.gov/1531/Design-Construction-Standards <br /> Task 4: Attach Topographic Survey (required for some projects) <br /> A topographic survey prepared by a registered land surveyor, civil engineer or other <br /> ��� <br /> qualified professional is required if your project site includes steep slopes, critical areas, <br /> flood or geologic hazards or at the discretion of the stormwater reviewer. <br /> Task 5: Attach Declaration of Covenant and Grant of Easement <br /> �� To ensure future maintenance and allow access for inspection, any On-Site Stormwater <br /> BMP (MR #5)constructed as part of the project must have a Declaration of Covenant and <br /> Grant of Easement. Fill out and attach the Declaration of Covenant and Grant of Easement. <br /> For a copy,visit everettwa.gov/1985/Stormwater-Technical-Resources <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 6 <br />