Laserfiche WebLink
From: John Bertrand <br /> Sent: Wednesday, December 1, 2021 3:55 PM <br /> To: QGIBUILDERS@YAHOO.COM <br /> Subject: B2110-028 1432 LOMBARD AVE <br /> Attachments: Everett Small Project Stormwater Plan Template_Combined Sewer Area <br /> (FILLABLE).pdf <br /> Dear Applicant. Public Works has had a chance to review your Building Permit application B2110-028 <br /> now and has the following comments: <br /> • Note that the proposed rear alley driveway needs to consist of a durable all-weather driving <br /> surface so please identify it as having one (concrete, asphalt, etc.) Gravel is not a durable all- <br /> weather driving surface. <br /> • Note that each downspout can drain up to only about 700 SF feet or so, and the new garage is <br /> about 832 SF, so this project may need up to two to three downspouts and drainage areas. <br /> • To that end, please consider that two or more additional downspouts may be needed, and <br /> provide calculations of the areas they may also need to drain to. <br /> • Finally, use the Everett Construction SWPPP for Small Projects provided above for your <br /> convenience, or hire your own professional to address stormwater runoff management and a <br /> SWPPP for erosion and sedimentation control. <br /> Please let me know if you have any questions. <br /> — John Bertrand <br /> Development Technician I Permit Services <br /> 425.257.8810 1 3200 Cedar Street, 2"d Floor, Everett, WA 98201 <br /> EVERETT Phone Hours: M/W/Th: 8 a.m.—12 p.m & 1 p.m.—3 p.m. <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant <br /> to the Public Records Act. <br /> ood afternoon. <br />