My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20 SW EVERETT MALL WAY EMERALD SPA 2025-04-14
>
Address Records
>
SW EVERETT MALL WAY
>
20
>
EMERALD SPA
>
20 SW EVERETT MALL WAY EMERALD SPA 2025-04-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 1:41:23 PM
Creation date
2/24/2025 8:17:54 AM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
20
Tenant Name
EMERALD SPA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J GENERAL NOTES: L c " HOUSeplants Galore Bubble <br /> -- n <br /> W -' <br /> 1) Complete installation of mechanical system shall be per the most current building codes and I �- I e�att Vida Integrated <br /> regulations as adopted by the local jurisdiction. �� 100th Health Everett Q Iq <br /> 2) All air conditioning units without internal traps shall have a P Trap for the condensate pan with — - ersports `sip Sound Credi <br /> tees for cleaning and condensate pipes shall be discharged to existing waste pipe per IMC gvarna <br /> - Union Everei <br /> ... p W <br /> 307.2.4 , mil~ I ycle dealer <br /> 3) Mechanical contractor shall coordinate diffuser locations and duct routing clearances with tr0 J <br /> structural and reflected ceiling plans. fff...111 <br /> 4) All fire rated structure shall be fire dampered per IMC 607.5. _ - Majlory Paint Store a ai Ov <br /> 5) All air distribution outlets shall have volume control devices per IMC 603.18. Benjamin Moore Foss At J <br /> y Tint Eve � <br /> 6 Mechanical contractor shall locate and coordinate exact location ofpiping,ductwork,and - _ / n Mint store Q V 0 <br /> S I Car stere( ¢�2 <br /> penetrations with the structure. - `vygy : air Q Z v 00 rn @)v <br /> N <br /> 7) Maximum length of flexible duct shall be 20'or as shown on drawings. '�f O Z ¢o <br /> Itn _ Sea Pac Homes9 U = <br /> 8) All ductwork,equipments,and piping shall be seismically supported per SMACNA and local r' / W Z a w ZQ <br /> regulations per IMC 603.10. J ~ � C7 Z O a n <br /> 9) All metal and flexible ductwork shall be constructed as specified in order to conform to ®PeopleRealy Z � N <br /> ro Project Location N <br /> SMACNA duct construction standards. I � Y M�Y-- <br /> 10) All air filters shall have the minimum MERV value of not less than 6 per IMC 605.4. Project Location"` <br /> J Evolution Industries <br /> 11) All equipment in concealed spaces requiring access shall have access door and a working Custom Creations <br /> space not less than 30"deep and 30"wide per IMC 306.1. <br /> 12) The system ducts will be classified as low pressure ducts whereas all duct joints,seams,and <br /> connections shall be securely fastened and sealed with approved mastic duct sealer per IMC m Site Plan (Ref. Only) m V i c i n i ty Map (Ref. O n I y) <br /> 603.9. <br /> Scale: N.T.S. N Scale: N.T.S. <br /> 13) All other related permits required for system start up shall be applied and obtained separately <br /> N <br /> by their respective contractors. <br /> 14) The contractor shall not operate the equipment for temporary heating or ventilation during PROPERTY DATA <br /> construction.(All equipment shall run for testing and balancing only per section WSEC <br /> C408.2.2.1) Address:20 SW EVERETT MALL WAY'SUITE 8',EVERETT,WA 98204 <br /> 15) Each fan unit over 2,000 CFM shall have a duct/smoke detector per IMC 606.2 in return ducts <br /> as required by the jurisdiction to have unit shut down upon smoke detection unless the system Property Owner:MALL AND MERIDIAN LLC LEGEND 00 <br /> is incapable of spreading smoke beyond the enclosing walls. W <br /> 16) Duct systems shall not have a flame spread index greater than 25 and a smoke develop index Parcel Number:00396900006000 SYMBOL ABBRV DESC. H <br /> of not more than 50 per IMC 602.2.1.8. <br /> Lot Size:0.83 ACRES O T'Stat Thermostat <br /> 17) Contractor is to bring up discrepancies and items which are not specifically called for or shown, } <br /> but are required for a complete mechanical system. Tenant Area Size:915 SF L VD Adjustable volume damper Z <br /> 18) All equipment supplied for these specifications shall be free from defects in material, _0 _J <br /> workmanship,and title. Legal Description:BROADWAY CREST BLK 000 D-00-LOTS 60&61 LESS PTN Q CD Round Ceiling diffuser(Positive pressure) I— Q v <br /> LOT 61 TO CTY EVE DAF-BEG ATNW COR SD LOT TH N69*29 06E 11 FT ALG Q Q 2i oN <br /> SLYMGN EVE MALL WAY TH S34*40 32W 18.06FT TO E MGN 1 ST PLW(HOWARD (N) New work for round duct d H 00 <br /> ENERGY CODE NOTES: AVE)TH NOO.07 53W 11 FT ALG SD E MGN TPB PER SWDAF 8605140335 0 N W Q <br /> UI Z 0 W <br /> 1) Thermostats shall be a 7-day programmable type thermostat with a 5 degree deadband and New work for flex duct Z_ <br /> H fr H <br /> automatic setback control per WSEC C403.4.2 and WSEC C403.4.1.2.Operating schedules shall Q w ~ <br /> CODE COMPLIANCE ® CD Square ceiling diffuser cc LU <br /> be confirmed and adjusted as necessary. U W LU Cc <br /> 2) During occupancy,the system shall maintain minimum outdoor air ventilation,and on calls for 2018 International Mechanical Code(2018 IMC) ® EF Exhaust fan '3 W N W <br /> heating and cooling. 2018 International Building Code(2018 IBC) 0 <br /> 3) HVAC shall meet minimum energy efficiency rating of table C403.3.2 per WSEC C403.3.2. 2018 Washington State Commercial Energy Code(2018 WSEC) 12"0 Duct Size(0 for round/A X B for square) Cc <br /> 4) Duct insulation shall meet rating of table C403.10.1.2 per WSEC C403.10.1.2. 00 CFM Output D_ <br /> FM <br /> 5) Supply and return ducts in the unconditioned space shall be insulated to a minimum of R-6 All codes shall be referenced with their respective city amendments. <br /> A.F.F. Above finished floor REVISIONS: <br /> insulation per WSEC C403.10.1.2. <br /> 6) Piping insulation shall meet the requirements of Table 403.10.3 per WSEC C403.10.3. SHEET INDEX HRV Heat Recovery Unit <br /> 7) Outside air shall have motorized dampers or automatic dampers for all outside air intakes per <br /> WSEC 403.7.8.2 M1-Cover Page a <br /> �—Reference for Section of Interest <br /> 8) Piping insulation shall be protected from damage and weather per WSEC C403.10.3.1 M2-Mechanical Main Floor Plan 1 Page where reference can be found. <br /> 9) HVAC system shall be commissioned and balanced per WSEC C408.2.2. 3� <br /> 10) Heat pump systems shall be prevented from operating when the heating load can be met by the Flag showing sectional point of view <br /> heat pump alone.Supplement heat is permitted during outdoor defrost cycles per WSEC DATE: 2/9/2023 <br /> C403.4.1.1. Reducer for spiral ductwork <br /> 11) Air leakage test shall be performed by a third party if necessary to meet a minimum air leakage of SHEET: <br /> 0.25 CFM/SF at.3"W.C.per SEC C402.5.1.2. Hidden lines <br /> 12) Close out documents and training of building operations for mechanical components,equipment, �► /� <br /> and systems shall be provided at closeout. M <br /> 13) Cooling systems shall have no less than 2 stages of fan control.Low speed shall not be greater <br /> than 66%of full speed and shall not draw more than 40%power per SEC C403.8.5.1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.