Laserfiche WebLink
J GENERAL NOTES: L c " HOUSeplants Galore Bubble <br /> -- n <br /> W -' <br /> 1) Complete installation of mechanical system shall be per the most current building codes and I �- I e�att Vida Integrated <br /> regulations as adopted by the local jurisdiction. �� 100th Health Everett Q Iq <br /> 2) All air conditioning units without internal traps shall have a P Trap for the condensate pan with — - ersports `sip Sound Credi <br /> tees for cleaning and condensate pipes shall be discharged to existing waste pipe per IMC gvarna <br /> - Union Everei <br /> ... p W <br /> 307.2.4 , mil~ I ycle dealer <br /> 3) Mechanical contractor shall coordinate diffuser locations and duct routing clearances with tr0 J <br /> structural and reflected ceiling plans. fff...111 <br /> 4) All fire rated structure shall be fire dampered per IMC 607.5. _ - Majlory Paint Store a ai Ov <br /> 5) All air distribution outlets shall have volume control devices per IMC 603.18. Benjamin Moore Foss At J <br /> y Tint Eve � <br /> 6 Mechanical contractor shall locate and coordinate exact location ofpiping,ductwork,and - _ / n Mint store Q V 0 <br /> S I Car stere( ¢�2 <br /> penetrations with the structure. - `vygy : air Q Z v 00 rn @)v <br /> N <br /> 7) Maximum length of flexible duct shall be 20'or as shown on drawings. '�f O Z ¢o <br /> Itn _ Sea Pac Homes9 U = <br /> 8) All ductwork,equipments,and piping shall be seismically supported per SMACNA and local r' / W Z a w ZQ <br /> regulations per IMC 603.10. J ~ � C7 Z O a n <br /> 9) All metal and flexible ductwork shall be constructed as specified in order to conform to ®PeopleRealy Z � N <br /> ro Project Location N <br /> SMACNA duct construction standards. I � Y M�Y-- <br /> 10) All air filters shall have the minimum MERV value of not less than 6 per IMC 605.4. Project Location"` <br /> J Evolution Industries <br /> 11) All equipment in concealed spaces requiring access shall have access door and a working Custom Creations <br /> space not less than 30"deep and 30"wide per IMC 306.1. <br /> 12) The system ducts will be classified as low pressure ducts whereas all duct joints,seams,and <br /> connections shall be securely fastened and sealed with approved mastic duct sealer per IMC m Site Plan (Ref. Only) m V i c i n i ty Map (Ref. O n I y) <br /> 603.9. <br /> Scale: N.T.S. N Scale: N.T.S. <br /> 13) All other related permits required for system start up shall be applied and obtained separately <br /> N <br /> by their respective contractors. <br /> 14) The contractor shall not operate the equipment for temporary heating or ventilation during PROPERTY DATA <br /> construction.(All equipment shall run for testing and balancing only per section WSEC <br /> C408.2.2.1) Address:20 SW EVERETT MALL WAY'SUITE 8',EVERETT,WA 98204 <br /> 15) Each fan unit over 2,000 CFM shall have a duct/smoke detector per IMC 606.2 in return ducts <br /> as required by the jurisdiction to have unit shut down upon smoke detection unless the system Property Owner:MALL AND MERIDIAN LLC LEGEND 00 <br /> is incapable of spreading smoke beyond the enclosing walls. W <br /> 16) Duct systems shall not have a flame spread index greater than 25 and a smoke develop index Parcel Number:00396900006000 SYMBOL ABBRV DESC. H <br /> of not more than 50 per IMC 602.2.1.8. <br /> Lot Size:0.83 ACRES O T'Stat Thermostat <br /> 17) Contractor is to bring up discrepancies and items which are not specifically called for or shown, } <br /> but are required for a complete mechanical system. Tenant Area Size:915 SF L VD Adjustable volume damper Z <br /> 18) All equipment supplied for these specifications shall be free from defects in material, _0 _J <br /> workmanship,and title. Legal Description:BROADWAY CREST BLK 000 D-00-LOTS 60&61 LESS PTN Q CD Round Ceiling diffuser(Positive pressure) I— Q v <br /> LOT 61 TO CTY EVE DAF-BEG ATNW COR SD LOT TH N69*29 06E 11 FT ALG Q Q 2i oN <br /> SLYMGN EVE MALL WAY TH S34*40 32W 18.06FT TO E MGN 1 ST PLW(HOWARD (N) New work for round duct d H 00 <br /> ENERGY CODE NOTES: AVE)TH NOO.07 53W 11 FT ALG SD E MGN TPB PER SWDAF 8605140335 0 N W Q <br /> UI Z 0 W <br /> 1) Thermostats shall be a 7-day programmable type thermostat with a 5 degree deadband and New work for flex duct Z_ <br /> H fr H <br /> automatic setback control per WSEC C403.4.2 and WSEC C403.4.1.2.Operating schedules shall Q w ~ <br /> CODE COMPLIANCE ® CD Square ceiling diffuser cc LU <br /> be confirmed and adjusted as necessary. U W LU Cc <br /> 2) During occupancy,the system shall maintain minimum outdoor air ventilation,and on calls for 2018 International Mechanical Code(2018 IMC) ® EF Exhaust fan '3 W N W <br /> heating and cooling. 2018 International Building Code(2018 IBC) 0 <br /> 3) HVAC shall meet minimum energy efficiency rating of table C403.3.2 per WSEC C403.3.2. 2018 Washington State Commercial Energy Code(2018 WSEC) 12"0 Duct Size(0 for round/A X B for square) Cc <br /> 4) Duct insulation shall meet rating of table C403.10.1.2 per WSEC C403.10.1.2. 00 CFM Output D_ <br /> FM <br /> 5) Supply and return ducts in the unconditioned space shall be insulated to a minimum of R-6 All codes shall be referenced with their respective city amendments. <br /> A.F.F. Above finished floor REVISIONS: <br /> insulation per WSEC C403.10.1.2. <br /> 6) Piping insulation shall meet the requirements of Table 403.10.3 per WSEC C403.10.3. SHEET INDEX HRV Heat Recovery Unit <br /> 7) Outside air shall have motorized dampers or automatic dampers for all outside air intakes per <br /> WSEC 403.7.8.2 M1-Cover Page a <br /> �—Reference for Section of Interest <br /> 8) Piping insulation shall be protected from damage and weather per WSEC C403.10.3.1 M2-Mechanical Main Floor Plan 1 Page where reference can be found. <br /> 9) HVAC system shall be commissioned and balanced per WSEC C408.2.2. 3� <br /> 10) Heat pump systems shall be prevented from operating when the heating load can be met by the Flag showing sectional point of view <br /> heat pump alone.Supplement heat is permitted during outdoor defrost cycles per WSEC DATE: 2/9/2023 <br /> C403.4.1.1. Reducer for spiral ductwork <br /> 11) Air leakage test shall be performed by a third party if necessary to meet a minimum air leakage of SHEET: <br /> 0.25 CFM/SF at.3"W.C.per SEC C402.5.1.2. Hidden lines <br /> 12) Close out documents and training of building operations for mechanical components,equipment, �► /� <br /> and systems shall be provided at closeout. M <br /> 13) Cooling systems shall have no less than 2 stages of fan control.Low speed shall not be greater <br /> than 66%of full speed and shall not draw more than 40%power per SEC C403.8.5.1. <br />