My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20 SW EVERETT MALL WAY EMERALD SPA 2025-04-14
>
Address Records
>
SW EVERETT MALL WAY
>
20
>
EMERALD SPA
>
20 SW EVERETT MALL WAY EMERALD SPA 2025-04-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 1:41:23 PM
Creation date
2/24/2025 8:17:54 AM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
20
Tenant Name
EMERALD SPA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resubmittal Memorandum <br /> February 28, 2022 <br /> 4. The minimum clear open width for all doors should be 32 inches. See IBC <br /> Section 1010.1.1. <br /> Response: Noted.The plans have been updated to show adequate door <br /> openings on all doors.See A1.0. <br /> 5. The new Break Room does not provide sufficient accessible access, exiting, <br /> and turnaround clearance. The room should be revised. See IBC Section <br /> 1101.2, and ICC A117.1-09 Sections 304 and 404. <br /> Response: Noted.The break room layout has been updated to meet the code <br /> compliance.Shower stall is removed and laundry equipments have been <br /> relocated.See A1.0. <br /> 6. The new Break Room is understood to have a new sink and laundry facilities. <br /> This should be shown as new work in the Proposed Floor Plan. See IBC <br /> Sections 105.1 and 107.2.1. <br /> Response:Noted. New works are indicated on the proposed floor plan. See <br /> A1.0. <br /> 7. The new Break Room includes a new shower. The shower size and access is <br /> required to comply with the accessibility requirements of ICC A117.1-09 <br /> Section 608. Details for grab bars should be included in the construction <br /> drawings. See IBC Section 1101.2. <br /> Response:The new shower in the new Break Room is removed to meet code <br /> compliance.See A1.0. <br /> 8. The Restroom is understood to have a new sink cabinet installed. This should <br /> be shown as new work in the Proposed Floor Plan. See IBC Sections 105.1 <br /> and 107.2.1. <br /> Response:The new shower in the new Break Room is removed to meet code <br /> compliance.See A1.0. <br /> 9. The Restroom is understood to have a new water heater installed between <br /> the sink and toilet. See IBC Sections 105.1 and 107.2.1. The following <br /> comments should be addressed: <br /> a. The water heater should be shown as new work. <br /> b. The water heater encroaches on the accessible clearances for the toilet <br /> and cannot be installed where shown. The water heater should be moved <br /> to another location. See IBC Section 1101.2 and ICC A117.1-09 Section <br /> 604. <br /> c. Seismic straps should be specified to restrain the water heater. <br /> Response:The water heater is removed to meet code compliance.See A1.0. <br /> �� 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.