My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6107 BERKSHIRE DR T MOBILE ANTENNA 2025-04-11
>
Address Records
>
BERKSHIRE DR
>
6107
>
T MOBILE ANTENNA
>
6107 BERKSHIRE DR T MOBILE ANTENNA 2025-04-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2025 11:02:11 AM
Creation date
2/24/2025 8:48:48 AM
Metadata
Fields
Template:
Address Document
Street Name
BERKSHIRE DR
Street Number
6107
Tenant Name
T MOBILE ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: May 25, 2021 80 BLACK&VEATCH <br /> Building a world of difference! <br /> Black&Veatch Corp. <br /> 6800 W. 115th St., Suite 2292 <br /> Overland Park, KS 66211 <br /> (913)458-6909 <br /> Subject: Structural Analysis Report <br /> Carrier Designation: T-Mobile Co-Locate <br /> Site Number: SE01603A <br /> Site Name: Everett Monopole <br /> Crown Castle Designation: BU Number: 823967 <br /> Site Name: Everett Monopole <br /> JDE Job Number: 636935 <br /> Work Order Number: 1954302 <br /> Order Number: 546770 Rev. 1 <br /> Engineering Firm Designation: Black&Veatch Corp. Project Number: 406642 <br /> Site Data: 6107 Berkshire Dr.,Everett,Snohomish County,WA <br /> Latitude 47°56'34.49", Longitude-?22°/2'45.47" <br /> 127 Foot-Monopole Tower <br /> Black & Veatch Corp. is pleased to submit this "Structural Analysis Report" to determine the structural <br /> integrity of the above-mentioned tower. <br /> The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we <br /> have determined the tower stress level for the structure and foundation, under the following load case, to be: <br /> LC5: Proposed Equipment Configuration Sufficient Capacity <br /> This analysis utilizes an ultimate 3-second gust wind speed of 98 mph as required by the 2018 Washington <br /> State Building Code.Applicable Standard references and design criteria are listed in Section 2 -Analysis <br /> Criteria. <br /> Structural analysis prepared by: Phutthiphong Suwantha <br /> Respectfully submitted by: <br /> Noel Z. Herrera, S.E. �v 'ox <br /> Structural Engineer <br /> -o tt .sig�ied by <br /> werrere Ncei 44, Ay <br /> DN.CN nera. `f1O ' 48406 .4 <br /> Herret Nod€ �cem ,.. S '"awi BK <br /> co p be ia: `r'ONAL0 <br /> DC bvcbi%;pc=ret <br /> Va JO <br /> tnxTower Report-version 8.0.9.0 <br /> c p <br />
The URL can be used to link to this page
Your browser does not support the video tag.