Laserfiche WebLink
May 25, 2021 <br /> 127 Ft Monopole Tower Structural Analysis CCI BU No 823967 <br /> Project Number 406642, Order 546770, Revision 1 Page 2 <br /> TABLE OF CONTENTS <br /> 1) INTRODUCTION <br /> 2)ANALYSIS CRITERIA <br /> Table 1 - Proposed Equipment Configuration <br /> Table 2-Other Considered Equipment <br /> 3)ANALYSIS PROCEDURE <br /> Table 3-Documents Provided <br /> 3.1)Analysis Method <br /> 3.2)Assumptions <br /> 4)ANALYSIS RESULTS <br /> Table 4-Section Capacity(Summary) <br /> Table 5-Tower Component Stresses vs. Capacity <br /> 4.1) Recommendations <br /> 5)APPENDIX A <br /> tnxTower Output <br /> 6)APPENDIX B <br /> Base Level Drawing <br /> 7)APPENDIX C <br /> Additional Calculations <br /> tnxTower Report-version 8.0.9.0 , tDA <br />