Laserfiche WebLink
ZZ. HVAC: Owner is to supply all modifications and alterations to the existing RTU' s as required to <br /> meet warrantable flashing height requirements. Alter existing system and add new construction, <br /> keeping existing in operation. <br /> 1. All wood supports for electrical conduit and gas line supports must be replaced with new <br /> Dura-Blok, or equal premanufactured units to accommodate the new roof system. <br /> 2. Repair damaged or missing drain lines for the swamp cooler overflow drain. Extend drain <br /> lines to the nearest roof drain. Provide supports as specified. Typical. <br /> 3. All mechanical, electrical, and plumbing work to be performed by a licensed trade <br /> contractor within the jurisdiction of the contract facility's address. <br /> 4. Temporarily remove all roof top equipment resting on roof surface or on existing <br /> equipment pads. Reinstall over walkpads, or raised to an alternative support curb, as <br /> shown in the contract plans when roofing work is complete. <br /> 5. Inspect all heater stacks (b-vents) and replace defective/ rusted piping above the roof <br /> with new 302/304 stainless steel insulated units to fit existing extensions. <br /> 6. All roof top condenser units are to be secured to the existing or new roof curbs in <br /> accordance with new FM Global requirements for roof top wind securement. <br /> AAA. Electrical Power and Lighting: Owner is to supply all modifications and alterations to the <br /> existing RTU' s as required to meet warrantable flashing height requirements. Alter existing <br /> system and add new construction, keeping existing in operation. <br /> 1.06 WORK BY OWNER <br /> A. HVAC: PROLOGIS, L.P. is to supply all modifications and alterations to the existing RTU' s as <br /> required to meet warrantable flashing height requirements. Alter existing system and add new <br /> construction, keeping existing in operation. <br /> B. Electrical Power and Lighting: PROLOGIS, L.P. is to supply all modifications and alterations to <br /> the existing RTU' s as required to meet warrantable flashing height requirements. Alter existing <br /> system and add new construction, keeping existing in operation. <br /> 1.07 OWNER OCCUPANCY <br /> A. Owner tenants intend to continue to occupy portions of the existing building during the entire <br /> construction period. <br /> B. Owner tenants intend to occupy the Project upon Substantial Completion. <br /> C. Cooperate with PROLOGIS, L.P. personnel to minimize conflict and to facilitate continuous <br /> operation. <br /> D. Schedule the Work to accommodate Owner tenant occupancy. <br /> 1.08 CONTRACTOR USE OF SITE AND PREMISES <br /> A. Construction Operations: Limited to areas approved for use by PROLOGIS tenants and/or <br /> vendors. <br /> 1. Locate and conduct construction activities in ways that will limit disturbance to site. <br /> B. Contractor is to access site in a safer manner as approved by: PROLOGIS, L.P. <br /> 1. Emergency Building Exits During Construction: Keep all exits required by code open <br /> during construction period; provide temporary exit signs if exit routes are temporarily <br /> altered. <br /> 2. Do not obstruct roadways, sidewalks, or other public ways without a permit or written <br /> permission from Tenant facility manager. <br /> C. PROLOGIS, L.P., and Tenant will approve space for site specific material and equipment <br /> storage at the Pre-Bid walk. <br /> D. Time Restrictions: <br /> 1. Tenant restrictions will be discussed at the Pre-Bid and memorialized in the meeting <br /> minutes or in an Addendum prior to the bid date.. <br /> E. Utility Outages and Shutdown: <br /> SEA00511 / Prologis - SEA00511 01 1000 - 7 Summary <br /> - FY24- Everett 1 - Capital <br /> Roofing Project <br />