My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1200 INDUSTRY ST 2025-03-24
>
Address Records
>
INDUSTRY ST
>
1200
>
1200 INDUSTRY ST 2025-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 11:30:51 AM
Creation date
2/26/2025 11:54:49 AM
Metadata
Fields
Template:
Address Document
Street Name
INDUSTRY ST
Street Number
1200
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01 7000 <br /> EXECUTION AND CLOSEOUT REQUIREMENTS <br /> PART 1 GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. Examination, preparation, and general installation procedures. <br /> B. Pre-installation meetings. <br /> C. Cutting and patching. <br /> D. Cleaning and protection. <br /> E. Closeout procedures, including Contractor's Correction Punch List, except payment <br /> procedures. <br /> 1.02 RELATED REQUIREMENTS <br /> A. Section 01 1000 - Summary: Limitations on working in existing building; continued occupancy; <br /> work sequence; identification of salvaged and relocated materials. <br /> B. Section 01 3000 -Administrative Requirements: Submittals procedures, Electronic document <br /> submittal service. <br /> C. Section 01 4000 - Quality Requirements: Testing and inspection procedures. <br /> D. Section 01 5100 -Temporary Utilities: Temporary heating, cooling, and ventilating facilities. <br /> 1.03 SUBMITTALS <br /> A. See Section 01 3000 -Administrative Requirements, for submittal procedures. <br /> B. Cutting and Patching: Submit written request in advance of cutting or alteration that affects: <br /> 1. Structural integrity of any element of Project. <br /> 2. Integrity of weather exposed or moisture resistant element. <br /> 3. Efficiency, maintenance, or safety of any operational element. <br /> 4. Visual qualities of sight exposed elements. <br /> 5. Work of Owner or separate Contractor. <br /> PART 2 PRODUCTS <br /> 2.01 PATCHING MATERIALS <br /> A. New Materials: As specified in product sections; match existing products and work for patching <br /> and extending work. <br /> B. Type and Quality of Existing Products: Determine by inspecting and testing products where <br /> necessary, referring to existing work as a standard. <br /> C. Product Substitution: For any proposed change in materials, submit request for substitution <br /> described in Section 01 6000 - Product Requirements. <br /> PART 3 EXECUTION <br /> 3.01 EXAMINATION <br /> A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work. <br /> Start of work means acceptance of existing conditions. <br /> B. Verify that existing substrate is capable of structural support or attachment of new work being <br /> applied or attached. <br /> C. Examine and verify specific conditions described in individual specification sections. <br /> D. Take field measurements before confirming product orders or beginning fabrication, to minimize <br /> waste due to over-ordering or misfabrication. <br /> E. Verify that utility services are available, of the correct characteristics, and in the correct <br /> locations. <br /> SEA00511 / Prologis - SEA00511 01 7000 - 1 Execution and Closeout <br /> - FY24- Everett 1 - Capital Requirements <br /> Roofing Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.