|
G. Fit work airtight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces.
<br /> H. At penetrations of fire rated walls, partitions, ceiling, or floor construction, completely seal voids
<br /> with fire rated material , to full thickness of the penetrated element.
<br /> I. Patching:
<br /> 1. Finish patched surfaces to match finish that existed prior to patching. On continuous
<br /> surfaces, refinish to nearest intersection or natural break. For an assembly, refinish entire
<br /> unit.
<br /> 2. Match color, texture, and appearance.
<br /> 3. Repair patched surfaces that are damaged, lifted, discolored, or showing other
<br /> imperfections due to patching work. If defects are due to condition of substrate, repair
<br /> substrate prior to repairing finish.
<br /> 3.06 PROGRESS CLEANING
<br /> A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly
<br /> condition.
<br /> B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed
<br /> or remote spaces, prior to enclosing the space.
<br /> C. Broom and vacuum clean interior areas prior to start of surface finishing and continue cleaning
<br /> to eliminate dust.
<br /> D. Collect and remove waste materials, debris, and trash/rubbish from site periodically and
<br /> dispose off-site; do not burn or bury.
<br /> 3.07 PROTECTION OF INSTALLED WORK
<br /> A. Protect installed work from damage by construction operations.
<br /> B. Provide special protection where specified in individual specification sections.
<br /> C. Provide temporary and removable protection for installed products. Control activity in immediate
<br /> work area to prevent damage.
<br /> D. Provide protective coverings at walls, projections,jambs, sills, and soffits of openings.
<br /> E. Protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage, or movement
<br /> of heavy objects, by protecting with durable sheet materials.
<br /> F. Prohibit traffic or storage upon waterproofed or roofed surfaces. If traffic or activity is necessary,
<br /> obtain recommendations for protection from waterproofing or roofing material manufacturer.
<br /> G. Remove protective coverings when no longer needed; reuse or recycle coverings if possible.
<br /> 3.08 ADJUSTING
<br /> A. Adjust operating products and equipment to ensure smooth and unhindered operation.
<br /> 3.09 FINAL CLEANING
<br /> A. Use cleaning materials that are nonhazardous.
<br /> B. Clean interior and exterior glass, surfaces exposed to view; remove temporary labels, stains,
<br /> and foreign substances, polish transparent and glossy surfaces, vacuum carpeted and soft
<br /> surfaces.
<br /> C. Remove all labels that are not permanent. Do not paint or otherwise cover fire test labels or
<br /> nameplates on mechanical and electrical equipment.
<br /> D. Clean equipment and fixtures to a sanitary condition with cleaning materials appropriate to the
<br /> surface and material being cleaned.
<br /> E. Clean filters of operating equipment.
<br /> F. Clean debris from roofs, gutters, downspouts, scuppers, overflow drains, area drains, and
<br /> drainage systems.
<br /> SEA00511 / Prologis - SEA00511 01 7000 - 3 Execution and Closeout
<br /> - FY24- Everett 1 - Capital Requirements
<br /> Roofing Project
<br />
|