G. Clean site; sweep paved areas, rake clean landscaped surfaces. <br /> H. Remove waste, surplus materials, trash/rubbish, and construction facilities from the site; <br /> dispose of in legal manner; do not burn or bury. <br /> 3.10 CLOSEOUT PROCEDURES <br /> A. Make submittals that are required by governing or other authorities. <br /> B. Accompany Project Coordinator on preliminary inspection to determine items to be listed for <br /> completion or correction in the Contractor's Correction Punch List for Contractor's Notice of <br /> Substantial Completion. <br /> C. Notify Designer/Consultant when work is considered ready for Designer/Consultant's <br /> Substantial Completion inspection. <br /> D. Submit written certification containing Contractor's Correction Punch List, that Contract <br /> Documents have been reviewed, work has been inspected, and that work is complete in <br /> accordance with Contract Documents and ready for Designer/Consultant's Substantial <br /> Completion inspection. <br /> E. Conduct Substantial Completion inspection and create Final Correction Punch List containing <br /> Designer/Consultant's and Contractor's comprehensive list of items identified to be completed <br /> or corrected and submit to Designer/Consultant. <br /> F. Correct items of work listed in Final Correction Punch List and comply with requirements for <br /> access to Owner-occupied areas. <br /> G. Notify Designer/Consultant when work is considered finally complete and ready for Designer/ <br /> Consultant's Substantial Completion final inspection. <br /> H. Complete items of work determined by Designer/Consultant listed in executed Certificate of <br /> Substantial Completion. <br /> END OF SECTION 01 7000 <br /> SEA00511 / Prologis - SEA00511 01 7000 -4 Execution and Closeout <br /> - FY24- Everett 1 - Capital Requirements <br /> Roofing Project <br />