Laserfiche WebLink
1.06 FIELD CONDITIONS <br /> A. Owner will occupy portions of building immediately adjacent to selective demolition area. <br /> Conduct selective demolition so the Owner tenant operations will not be disrupted. <br /> B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far <br /> as practical. <br /> C. Notify Designer of discrepancies between existing conditions and Drawings before proceeding <br /> with selective demolition. <br /> D. Storage or sale of removed items or materials on-site is not permitted. <br /> E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against <br /> damage during selective demolition operations. <br /> 1. Maintain fire-protection facilities in service during selective demolition operations. <br /> 1.07 WARRANTY <br /> A. Contractor warrants against water or weather entry into the building for the duration of the <br /> project from mobilization through to the end of the project and to the greatest extent possible <br /> defined within the contract documents (5-year post installation contractors'warranty). <br /> PART 2 - PRODUCTS <br /> 2.01 PEFORMANCE REQUIREMENTS <br /> A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning <br /> selective demolition. Comply with hauling and disposal regulations of authorities having <br /> jurisdiction. <br /> B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241. <br /> C. All plywood and OSB decking to comply with APA Performance rated standards provided by- <br /> The Engineered Wood Association Standard PRP-108, Performance Standards and Policies <br /> for Structural-Use Panels, or TECO Standard PRP-133, Performance Standards and Policies <br /> for Wood-Based Structural-Use Panels and meet the description for the panel type in the <br /> individual designs. <br /> PART 3 - EXECUTION <br /> 3.01 EXAMINATION <br /> A. Verify that utilities have been disconnected and capped before starting selective demolition <br /> operations. <br /> B. Survey existing conditions and correlate with requirements indicated to determine extent of <br /> selective demolition required. <br /> C. When unanticipated mechanical, electrical, or structural elements that conflict with intended <br /> function or design are encountered, investigate, and measure the nature and extent of conflict. <br /> Promptly submit a written report to Designer. <br /> D. Survey of Existing Conditions: Record existing conditions by use of measured drawings. <br /> 3.02 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS <br /> A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and <br /> protect them against damage. <br /> B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, <br /> disconnect, and seal or cap off indicated utility services and mechanical/electrical systems <br /> serving areas to be selectively demolished. <br /> 1. Owner will coordinate with the MEP contractor for all disconnect and reconnection of the <br /> RTU's required to be raised. <br /> 2. PROLOGIS, L.P. will arrange to shut off indicated services/systems when requested by <br /> Contractor. <br /> SEA00511 / Prologis - SEA00511 02 4119 - 2 SELECTIVE DEMOLITION <br /> - FY24- Everett 1 - Capital <br /> Roofing Project <br />