9. Any exposed roof deck surfaces shall be left broom clean, dry, and dust free, ready for <br /> application of new roofing materials. <br /> B. Removed and Reinstalled Items: <br /> 1. Clean and repair items to functional condition adequate for intended reuse. <br /> 2. Pack or crate items after cleaning and repairing. Identify contents of containers. <br /> 3. Protect items from damage during transport and storage. <br /> 4. Reinstall items in locations indicated. Comply with installation requirements for new <br /> materials and equipment. Provide connections, supports, and miscellaneous materials <br /> necessary to make item functional for use indicated. <br /> C. Existing Items to Remain: Protect construction indicated to remain against damage and soiling <br /> during selective demolition. When permitted by Consultant/ Designer, items may be removed <br /> to a suitable, protected storage location during selective demolition and cleaned and reinstalled <br /> in their original locations after selective demolition operations are complete. <br /> 3.05 DISPOSAL OF DEMOLISHED MATERIALS <br /> A. General: Except for items or materials indicated to be recycled, reused, salvaged, reinstalled, or <br /> otherwise indicated to remain Owner's property, remove demolished materials from Project site <br /> and legally dispose of them in an EPA-approved landfill. <br /> 1. Do not allow demolished materials to accumulate on-site. <br /> 2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces <br /> and areas. <br /> 3. Remove debris from elevated portions of building by chute, hoist, or other device that will <br /> convey debris to grade level in a controlled descent. <br /> B. Burning: Do not burn demolished materials. <br /> C. Disposal: Transport demolished materials off Owner's property and legally dispose of them. <br /> 3.06 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS <br /> A. Roofing: Remove no more existing roofing than what can be covered in one day by new roofing <br /> so that building interior remains watertight and weathertight. <br /> B. Contractor is to consult with the Consultant/ Designer and Owner to determine if interior <br /> protection is to be required during the installation of the new roof system. <br /> 1. Remove existing roof flashing materials to the approved substrate as indicated on <br /> drawings. <br /> 3.07 CLEANING <br /> A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective <br /> demolition operations. Return adjacent areas to condition existing before selective demolition <br /> operations began. <br /> END OF SECTION 02 4119 <br /> SEA00511 / Prologis - SEA00511 02 4119 -4 SELECTIVE DEMOLITION <br /> - FY24- Everett 1 - Capital <br /> Roofing Project <br />