1. Galvanized, common, annular ring nail. <br /> 2. Withdrawal and pull-over resistance shall be 100 lbs. per nail minimum. <br /> 3. Length: Sufficient to penetrate preceding blocking by 1- '/4". <br /> I. Wood to Hard Rock Concrete: <br /> 1. Wedge Anchor and Washer: <br /> a. Minimum Diameter: '/2' <br /> b. Maximum Spacing: 40" o.c. <br /> J. Sleeve Anchor and Washer: <br /> 1. Minimum Diameter: d" <br /> 2. Maximum Spacing: 30" o.c. <br /> K. Threaded Concrete Anchor: <br /> 1. Minimum Diameter: '/4" <br /> 2. Maximum Spacing: 12" o.c. <br /> L. Drive Anchor: <br /> 1. Minimum Diameter: '/4" <br /> 2. Maximum Spacing: 12" o.c. <br /> 2.06 METAL FRAMING ANCHORS: <br /> A. General: Provide galvanized steel framing anchors of structural capacity, type and size <br /> indicated and as follows: <br /> B. Galvanized Steel Sheet: Hot-dip, zinc-coated steel sheet complying with ASTM-A-653, G60 <br /> (ASTM-A-653M, Z180) coating designation; structural, commercial, or lock-forming quality as <br /> standard with manufacturer for type of anchor indicated. <br /> 2.07 MISCELLANEOUS MATERIALS: <br /> A. Adhesives for Field Gluing Panels to Framing: Formulation complying with APA AFG-01 that is <br /> approved for use with type of construction panel indicated by both adhesive and panel <br /> manufactures. <br /> B. Water Repellent Preservative: NWWDA-tested and accepted formulation containing 3-iodo-2- <br /> propyl butyl carbonate (IPBC)as its active ingredient. <br /> PART 3 - EXECUTION: <br /> 3.01 INSPECTION: <br /> A. The roofing consultant will inspect the roof system periodically during installation and perform a <br /> final inspection. Certain essential inspections are required to be performed by the consultant as <br /> outlined in the "Quality Assurance" section of these specifications. The contractor shall advise <br /> the consultant when he/she plans to start the rough carpentry installation and when the <br /> essential inspections are to be performed. Contractor shall advise the consultant of all changes <br /> from that schedule. Failure to give proper notification of project delay shall result in a back <br /> charge to the contractor for the consultant's time and expenses. <br /> B. General Substrate Inspection: <br /> 1. Verify that bolts anchoring existing wood nailers to concrete walls comply with FMRC <br /> Bulletin 1-49, "Perimeter Flashing". <br /> 2. For existing nailers, exposed and left in place, verify that existing bolts or fasteners are <br /> tight, secure, and meet the requirements of these specifications. Tighten, reset, or replace <br /> fasteners that are loose, deformed, damaged, corroded or not in compliance with <br /> specifications. <br /> 3. See that all surfaces are sound, even, and free of any foreign material or moisture. <br /> 4. Immediately notify the owner's representative of any defects or damage to the substrate. <br /> Do not apply the rough carpentry until these defects have been corrected. <br /> 5. Inspect underside of deck and map out any conduit pipes that may be mounted to the <br /> underside of the deck. These areas shall be avoided when installing steel deck screws. <br /> SEA00511 / Prologis - SEA00511 06 1000 - 3 Rough Carpentry <br /> - FY24- Everett 1 - Capital <br /> Roofing Project <br />