Laserfiche WebLink
F. Provide joist hangers and wood stringers spaced as required to support anticipated loads. <br /> G. Install 3/4' minimum plywood over the curb and stringers, fastened 6" on center. <br /> H. Waterproofing and metal caps to be installed by others. <br /> 3.07 SLEEPERS: <br /> A. Provide treated wood pipe supports 8' on center for conduits and pipes up to 1" diameter. <br /> Fabricate to meet minimum height requirements of pipes. For larger pipes, furnish and install <br /> supports with base flashing, metal caps, and adjustable roller mechanism. <br /> B. Clamp the conduit or pipe to the supports using metal straps, loosely fitted. Straps or clamps <br /> and fasteners shall be compatible with the type of pipe being used. <br /> C. Set the small pipe supports on asphalt protection pads provided by others. <br /> 3.08 FIELD QUALITY CONTROL: <br /> A. Manufacturer's Field Service: Manufacturer's representative shall make a deck inspection prior <br /> to start of installation, provide intermittent inspections, and a final inspection to determine that <br /> the entire roof system has been installed according to manufacturer's specifications and <br /> approved details. <br /> B. Field Auditor: A qualified Roof Inspection Service will be retained by the owner to provide <br /> auditing of the roofing installation. <br /> 3.09 CLEANUP: <br /> A. Upon completion of roofing work, the roofing contractor shall remove all remaining materials, <br /> debris, and leave building and worksite in a neat, clean and undamaged condition. <br /> END OF SECTION 06 1000 <br /> SEA00511 / Prologis - SEA00511 06 1000 - 6 Rough Carpentry <br /> - FY24- Everett 1 - Capital <br /> Roofing Project <br />