Laserfiche WebLink
SECTION 07 0150 <br /> PREPARATION FOR RE-ROOFING <br /> PART 1 GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. Re-cover of existing roofing system in preparation for entire new roofing system. <br /> B. Removal of existing flashing and counterflashings. <br /> C. Temporary roofing protection. <br /> 1.02 RELATED REQUIREMENTS <br /> A. Section 07 5400 -Thermoplastic Membrane Roofing. <br /> B. Section 07 6200 - Sheet Metal Flashing and Trim. <br /> 1.03 REFERENCE STANDARDS <br /> A. ASTM C1153- Standard Practice for Location of Wet Insulation in Roofing Systems Using <br /> Infrared Imaging 2010 (Reapproved 2015). <br /> B. ASTM C1177/C1177M - Standard Specification for Glass Mat Gypsum Substrate for Use as <br /> Sheathing 2017. <br /> C. PS 1 - Structural Plywood 2019. <br /> D. PS 2 - Performance Standard for Wood Structural Panels 2018. <br /> 1.04 ADMINISTRATIVE REQUIREMENTS <br /> A. Coordinate with affected mechanical and electrical work associated with roof penetrations. <br /> B. Preinstallation Meeting: Convene one week before starting work of this section. <br /> 1. Attendees: <br /> a. Designer/Consultant. <br /> b. Contractor. <br /> c. Owner. <br /> d. Installer. <br /> e. Roofing system manufacturer's field representative. <br /> f. Inspection and Testing Agency Representatives. <br /> 2. Meeting Agenda: Provide agenda to participants prior to meeting in preparation for <br /> discussions on the following: <br /> a. Removal and installation schedule. <br /> b. Necessary preparatory work. <br /> c. Protection before, during, and after roofing system installation. <br /> d. Removal of existing roofing system. <br /> e. Installation of new roofing system. <br /> f. Temporary roofing and daily terminations. <br /> g. Transitions and connection to and with other work. <br /> h. Inspections and testing of installed systems. <br /> C. Schedule work to coincide with commencement of installation of new roofing system. <br /> 1.05 SUBMITTALS <br /> A. See Section 01 3000 -Administrative Requirements for submittal procedures. <br /> B. Product Data: Submit for each type of material. <br /> C. Shop Drawings: Indicate size, configuration, and installation details. <br /> D. Preconstruction Test Reports. <br /> 1. Fastener Pull Test Reports <br /> 2. Moisture Survey Reports <br /> SEA00511 / Prologis - SEA00511 07 0150 - 1 Preparation for Re-Roofing <br /> - FY24- Everett 1 - Capital <br /> Roofing Project <br />