Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 11/22/2024 11/22/2024 PW 22-OTHER I Andy Erickson NOT REQUIRED eTRAKiT Inspection Request <br /> Notes: <br /> 11/21/2024 10:48 AM Sam Fowler <br /> BMP T5.13 Amended Soils(Quality/Depth) <br /> Contact Name:Sam Fowler <br /> Site Address:9908 18TH AVE W <br /> Phone:4257364549 <br /> e-Mail:srfowler@drhorton.com <br /> Amended soils inspection requested incorrectly. Will result inspection in correct location. <br /> 11/22/2024 11/22/2024 PW ASBUILTS JIM KNAPPERT APPROVAL <br /> SUBMITTED <br /> Notes: <br /> 11/22/2024 11/22/2024 WATER AS-BUILTS JIM KNAPPERT APPROVAL <br /> SUBMITTED <br /> Notes: <br /> 11/22/2024 11/22/2024 STORM AS-BUILTS JIM KNAPPERT APPROVAL <br /> SUBMITTED <br /> Notes: <br /> 11:45 BMP T5.13 <br /> 11/25/2024 11/25/2024 AM AMENDED SOILS Andy Erickson APPROVAL <br /> (QUALITY/DEPTH) <br /> Notes: <br /> 11/27/2024 11/27/2024 PLANNING KELSEY HEYD APPROVAL eTRAKiT Inspection Request <br /> LANDSCAPING <br /> Notes: <br /> 11/21/2024 10:31 AM PACIFIC RIDGE-DRH LLC <br /> Contact Name:PACIFIC RIDGE-DRH LLC <br /> Site Address:9908 18TH AVE W <br /> Phone:4254382945 <br /> e-Mail:cacliggott@drhorton.com <br /> Inspection completed on 11.27.24;approved for planning.Requested assurance device via email on 11.27.24: <br /> Good Afternoon, <br /> Thanks for requesting an inspection for the landscaping at Benton Square. I was able to stop by the site today and I have marked the inspection line as <br /> approved in our system.Please note that a maintenance assurance device is required for the landscaping improvements.I have attached our <br /> maintenance assurance device forms so you can get this process completed.Most select the bond option but we do have cash or set-aside options as <br /> well;please complete the applicable form for the assurance device you choose to proceed with.If you choose to proceed with the bond option(form 2), <br /> please also complete the attached assurance device license(form 6).The maintenance assurance device should have a 2-year expiration and shall not <br /> be less than 10%of the cost of the plantings and associated labor.You'll need to include a breakdown of these costs with your assurance device form so <br /> the record is clear how the 10%amount was determined. <br /> If you have any questions,please let me know and I'm happy to be of assistance! <br /> I <br /> Printed: Friday, 13 December, 2024 12 of 14 rk <br /> SUPERION <br />