My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9908 18TH AVE W 2025-04-01
>
Address Records
>
18TH AVE W
>
9908
>
9908 18TH AVE W 2025-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 7:21:50 AM
Creation date
2/28/2025 9:29:53 AM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9908
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
623
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 09:00 PW 25-SITE CORRECTION <br /> 12/3/2024 12/3/2024 AM FINAL/PERMIT Andy Erickson REQUIRED eTRAKiT Inspection Request <br /> CLOSE OUT <br /> Notes: <br /> 12/2/2024 2:29 PM Jen Norton <br /> Contact Name:Jen Norton <br /> Site Address:9908 18TH AVE W <br /> Phone:4259391157 <br /> e-Mail:jnorton@drhorton.com <br /> Bonds need to be taken care of <br /> 12/10/2024 12/10/2024 PLANNING KELSEY HEYD RECEIVED SEE NOTES <br /> LANDSCAPE BOND <br /> Notes: <br /> sent email to cacliggott@drhorton.com assurance device information on 11.27.24; <br /> Good Afternoon, <br /> Thanks for requesting an inspection for the landscaping at Benton Square. I was able to stop by the site today and I have marked the inspection line as <br /> approved in our system.Please note that a maintenance assurance device is required for the landscaping improvements.I have attached our <br /> maintenance assurance device forms so you can get this process completed.Most select the bond option but we do have cash or set-aside options as <br /> well;please complete the applicable form for the assurance device you choose to proceed with.If you choose to proceed with the bond option(form 2), <br /> please also complete the attached assurance device license(form 6).The maintenance assurance device should have a 2-year expiration and shall not <br /> be less than 10%of the cost of the plantings and associated labor.You'll need to include a breakdown of these costs with your assurance device form so <br /> the record is clear how the 10%amount was determined. <br /> If you have any questions,please let me know and I'm happy to be of assistance! <br /> Thanks, <br /> UPDATE 12/10/24-2 Year Maintenance Assurance Device for Landscaping has been provided.See project file AF24-021 for assurance device details. <br /> 12/11/2024 12/11/2024 PW 1YR PUBLIC IMP THAD NEWPORT RECEIVED <br /> WARRANTY <br /> Notes: <br /> 12/11/2024 12/11/2024 PW 2YR DRAINAGE THAD NEWPORT RECEIVED <br /> IMP WARRANTY <br /> Notes: <br /> 12/12/2024 12/12/2024 1:00 PW 07-STORM&PM DRAINAGE Andy Erickson APPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 5/22/2024 7:31 AM PACIFIC RIDGE-DRH LLC <br /> Storm connection inspection for building C Units A,B,and C.Address 9918 18th AVE W.Unit B. <br /> Contact Name:PACIFIC RIDGE-DRH LLC <br /> Site Address:9908 18TH AVE W <br /> Phone:4254382945 <br /> e-Mail:EJSCHRADER@DRHORTON.COM <br /> I <br /> Printed: Friday, 13 December, 2024 13 of 14 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.