My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9920 18TH AVE W C 2025-04-01
>
Address Records
>
18TH AVE W
>
9920
>
9920 18TH AVE W C 2025-04-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 8:30:20 AM
Creation date
2/28/2025 11:38:34 AM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9920
Unit
C
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
113TIL 19011 Wood-Sno Road NE,Suite 100 <br /> Woodinville,WA 98072-4436 <br /> Phone:(425)814-8448 <br /> ENGINEERING Fax:(425)821-2120 <br /> SPECIAL INSPECTION <br /> Date: June 26,2024 <br /> To: Pacific Ridge Homes <br /> Attn: Ezra Schrader <br /> From: Ryan Hartman,P.E. <br /> Project: Benton Square TH—Building D Pages: 2 <br /> BTL Engineering has performed Special Inspection as required by the City of Everett for shear walls with edge <br /> nailing at 4"on center or less for the above-mentioned project. The following Special Inspection Report includes a <br /> summary of our site visit. <br /> Construction Documents: <br /> ❑ Construction Set dated 06/08/2023 <br /> Progress of construction: <br /> ❑ Date of inspection:06/13/2024 <br /> ❑ Foundation completed <br /> ❑ Framing completed <br /> Items observed: <br /> 31d Floor Exterior Walls: <br /> ❑ Front PI-3 Exterior Shear Wall(C-Units),Front P1-4 Exterior Shear Wall(B-Units) <br /> o Edge Nailing and Sheathing Splices:Construction conforms to plan set. <br /> Note:many instances of the party wall end nailing not tying into the exterior wall per detail 8/S06 <br /> and 16/S08 were observed at time of inspection.Builder has been notified and has provided <br /> pictures.Builder confirms construction conforms to plan set. <br /> o Panel Seam Construction:Construction conforms to plan set. <br /> o Plate Nailing and Framing Clips as specified on plans.Construction conforms to plan set. <br /> ❑ Rear P1-4 Exterior Shear Wall(Band C Units) <br /> o Edge Nailing and Sheathing Splices:Construction conforms to plan set. <br /> o Panel Seam Construction:Construction conforms to plan set. <br /> o Plate Nailing and Framing Clips as specified on plans.Construction conforms to plan set. <br /> 2nd Floor Exterior Walls: <br /> ❑ Front/Rear P1-2 Exterior Shear Wall(All units) <br /> o Edge Nailing and Sheathing Splices: <br /> Note:Many instances of the party wall end nailing not tying into the exterior wall per detail 8/S06 <br /> and 16/S08 were observed at time of inspection.Builder has been notified and has provided <br /> pictures.Builder confirms construction conforms to plan set. <br /> o Panel Seam Construction:Construction conforms to plan set. <br /> Note:Visible gap occurred at Grid 2 rear due to building separation.The gap has been <br /> filled,shear wall end studs have been screwed together as requested,and CS16 straps have <br /> been installed to tie the top plates together.Contractor has confirmed construction <br /> conforms to plan set. <br /> o Plate Nailing and Framing Clips as specified on plans:Construction conforms to plan set. <br />
The URL can be used to link to this page
Your browser does not support the video tag.