Laserfiche WebLink
June 26, 2024 <br /> 15'Floor Exterior Walls: <br /> ❑ Front P2-2 Exterior Shear Wall(All units) <br /> o Edge Nailing and Sheathing Splices:Construction conforms to plan set. <br /> o Plate Nailing and Framing Clips as specified on plans:Construction conforms to plan set. <br /> o Panel Seam Construction:Construction conforms to plan set. <br /> o Anchor bolt spacing:Construction conforms to plan set. <br /> ❑ Rear P1-4 Exterior Shear Wall(All units) <br /> o Edge Nailing and Sheathing Splices:Construction conforms to plan set. <br /> o Plate Nailing and Framing Clips as specified on plans.Construction conforms to plan set. <br /> o Panel Seam Construction.Construction conforms to plan set. <br /> o Anchor bolt spacing:Note:All anchor bolts were observed to be located too far away from the <br /> exterior sheathing per 1/S06.Builder has been notified and has provided pictures of the <br /> resolution;Builder confirms construction conforms to plan set. <br /> Give me a call if you have any questions or comments. <br /> Sincerely, <br /> Ryan Hartman,P.E. T. <br /> BTL Engineering <br /> �Z5 <br /> ssVXAL <br /> 9 Page 2 <br />