My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 45-06 Geotech Report 2025-03-03
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 45-06
>
Geotech Report
>
3003 W CASINO RD BLDG 45-06 Geotech Report 2025-03-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2025 2:59:00 PM
Creation date
3/3/2025 2:57:08 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 45-06
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> GEOTECHNICAL ENGINEERING REPORT <br /> PROPOSED FLIGHT LINE STEAM LINE PROJECT <br /> BOEING EVERETT FACILITY <br /> EVERETT, WASHINGTON <br /> Project No. 81115085 <br /> January 17, 2012 <br /> I <br /> 1.0 INTRODUCTION <br /> A geotechnical investigation has been completed for the proposed Flight Line Steam Line Project <br /> to be located at the Being Everett Facility in Everett, Washington. Four(4) borings, designated B-1 <br /> through B-4, were completed for this project to depths ranging from approximately 18'/z to 19 feet <br /> below the existing surface along the proposed steam line alignment. Logs of the borings along <br /> with a vicinity map and a boring location diagram are included in Appendix A of this report. <br /> The purpose of these services is to provide information and geotechnical engineering <br /> recommendations relative to: <br /> • subsurface soil conditions • seismic considerations <br /> • groundwater conditions ■ lateral earth pressures <br /> • earthwork • subsurface drainage <br /> 1 <br /> 2.0 PROJECT INFORMATION <br /> 2.1 Project Description <br /> P <br /> ' ITEM DESCRIPTION <br /> Site layout See Appendix A, Exhibit A-2: Boring Location Diagram <br /> tWe understand that a new steam line will be installed in a <br /> new 470 foot long utilidor extending from the southwest <br /> Steam Line corner of Building 40-21 to Vault E, which is located <br /> approximately 300 feet south of the southeast corner of <br /> Building 40-51. The proposed utilidor alignment is shown on <br /> Exhibit A-2. <br /> 1 <br /> I <br /> Responsive ■ Resourceful ■ Reliable 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.