My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3006 RUCKER AVE PORT GARDNER BAY WINERY 2025-04-07
>
Address Records
>
RUCKER AVE
>
3006
>
PORT GARDNER BAY WINERY
>
3006 RUCKER AVE PORT GARDNER BAY WINERY 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 10:28:39 AM
Creation date
3/4/2025 12:41:04 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3006
Tenant Name
PORT GARDNER BAY WINERY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mechanical Requirements • • of <br /> 2018 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved <br /> The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> NA C403.3.1 Equipment and Indicate that output capacities of heating and <br /> system sizing cooling equipment and systems are no greater <br /> than the smallest available equipment size that <br /> exceeds the calculated loads;note exceptions <br /> applied <br /> NA C403.3.2 HVAC equipment Provide equipment schedules on plans and in <br /> C403.9.1 performance WSEC mechanical equipment compliance <br /> requirements reports;indicate equipment type,calculated <br /> (efficiency) loads,capacity,rated and WSEC minimum <br /> efficiencies for all heating and cooling <br /> equipment;include supply and ventilation air <br /> cfms and operating hours for all air systems; <br /> identify heating and cooling equipment that <br /> does not have a corresponding WSEC <br /> minimum efficiency(manufacturer rated) <br /> NA C405.8 Electric motor List all motors> 1/12 hp(that are not integral <br /> efficiency to a rated piece of equipment)in the <br /> mechanical or electrical equipment schedules <br /> on plans;indicate motor type and applicable <br /> efficiency table,hp,rpm,number of poles and <br /> rated efficiency,or exception applied <br /> NA C403.3.2 Gas and oil-fired For forced air furnaces with capacity>_ <br /> forced air furnace 225,000 Btu/h and all unit heaters,indicate in <br /> and unit heaters equipment schedule intermittent ignition or <br /> IID,flue or draft damper,and rated jacket <br /> loss <br /> NA C403.3.2.4 Packaged electric Verify all packaged electric equipment with> <br /> heating/cooling 6,000 Btu/h cooling capacity and any amount <br /> equipment of heating is a heat pump;include in <br /> equipment schedules <br /> NA C403.3.3 Hot gas bypass For cooling equipment with hot gas bypass, <br /> limitation for DX provide either multiple step unloading or <br /> cooling equipment continuous capacity modulation;indicate <br /> bypass capacity per Table C403.3.3 <br /> NA C403.3.2.5 Humidification For cooling systems with humidification <br /> equipment that are also required to have air <br /> economizer,indicate humidifier is adiabatic <br /> (direct evaporative or fog atomization),or <br /> exception applied <br /> C403.3.2 Hydronic equipment Refer to Requirements List section Hydronic <br /> Systems-Equipment Selection& <br /> Performance for selection criteria specific to <br /> chillers and boilers <br /> NA C403.9 Heat rejection Refer to Requirements List section Heat <br /> equipment Rejection Systems-Equipment Selection& <br /> Performance for selection criteria specific to <br /> cooling towers,dry coolers and condensers <br /> (air-cooled and evaporative) <br /> EQUIPMENT SELECTION&PERFORMANCE-DEDICATED OUTSIDE AIR SYSTEMS(DOAS) <br /> Page 2125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.