My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3006 RUCKER AVE PORT GARDNER BAY WINERY 2025-04-07
>
Address Records
>
RUCKER AVE
>
3006
>
PORT GARDNER BAY WINERY
>
3006 RUCKER AVE PORT GARDNER BAY WINERY 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 10:28:39 AM
Creation date
3/4/2025 12:41:04 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3006
Tenant Name
PORT GARDNER BAY WINERY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mechanical Requirements • • 13 of <br /> 2018 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved <br /> The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> NA C403.10.1.1 Duct construction Indicate on plans that all ductwork is <br /> C403.10.2 constructed and sealed per IMC <br /> NA For outdoor air ductwork,also indicate on <br /> plans that ductwork meets air leakage <br /> requirements per C402.5 and vapor retarder <br /> requirements per the IBC <br /> NA C403.10.2.1 Duct pressure Identify location of low,medium and high <br /> C403.10.2.2 classifications pressure ductwork on plans <br /> C403.10.2.3 <br /> NA C403.10.2.3 High pressure duct Indicate high pressure duct leakage testing <br /> leakage test requirements on plans;provide test results to <br /> jurisdiction when completed <br /> NA C403.10.1.1 Duct insulation For outdoor air ductwork located within <br /> C403.10.1.2 conditioned space(upstream or downstream <br /> of shutoff damper),identify climate zone and <br /> indicate ductwork insulation R-value per <br /> Table C403.10.1.1 on plans;or exception <br /> applied <br /> NA For supply and return air ductwork located <br /> within unconditioned space or outdoors, <br /> identify climate zone and indicate ductwork <br /> insulation R-value per Table C403.10.1.2 on <br /> plans;or exception applied <br /> NA For supply air ductwork located within <br /> conditioned space,identify on plans if design <br /> supply air temperature is<55°F or>105°F; <br /> indicate ductwork insulation R-value per <br /> Table C403.10.1.2 on plans;or exception <br /> applied <br /> NA For return and exhaust air ductwork located <br /> within conditioned space(upstream of the <br /> shutoff damper)and downstream of an energy <br /> recovery media,indicate ductwork insulation <br /> R-value per Table C403.10.1.2;or exception <br /> applied <br /> NA For exhaust and relief air ductwork located <br /> within conditioned space and downstream of <br /> the shutoff damper,indicate ductwork <br /> insulation R-value per Table C403.10.1.2;or <br /> exception applied <br /> NA C403.10.1.1 Shaft and plenum For outdoor air shafts and plenums,indicate <br /> C402.1.3 insulation on plans that the R-value of insulation on <br /> these elements complies with Table C402.1.3 <br /> for steel-framed walls <br /> PIPING <br /> C403.10.3 Piping insulation Indicate design temperature range of fluid <br /> conveyed in piping and thickness of insulation <br /> (in inches)on hydronic piping plans;or <br /> exception applied <br /> C403.10.3.1 Protection of piping Indicate method of protection of pipe <br /> insulation insulation from damage/degredation on <br /> hydronic piping plans <br /> Page 13125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.