My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3006 RUCKER AVE PORT GARDNER BAY WINERY 2025-04-07
>
Address Records
>
RUCKER AVE
>
3006
>
PORT GARDNER BAY WINERY
>
3006 RUCKER AVE PORT GARDNER BAY WINERY 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 10:28:39 AM
Creation date
3/4/2025 12:41:04 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3006
Tenant Name
PORT GARDNER BAY WINERY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mechanical Requirements • • 24 of <br /> 2018 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved <br /> The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> Indicate occupancy sensing or timer switch <br /> controls configured to automatically shut off <br /> heating system when area served is <br /> unoccupied <br /> C403.11.2 Snow melt systems Indicate automatic controls configured to shut <br /> off system when pavement temperature <br /> exceeds 50°F and no precipitation is falling, <br /> and when outdoor air temperature exceeds <br /> 40°F <br /> C403.11.3 Freeze protection Indicate automatic controls to shut off system <br /> system controls when outdoor temperature exceeds 40°F,or <br /> conditions protect fluid from freezing <br /> HVAC EQUIPMENT ENERGY USE METERING <br /> C409.3.1 HVAC equipment For new buildings>50,000 sf and building <br /> energy use metering additions>25,000 sf,verfiy energy use <br /> metering of all equipment used to provide <br /> space heating and cooling,dehumidification <br /> and ventilation will be provided per C409; <br /> indicate equipment eligible for exception <br /> DOCUMENTATION AND SYSTEM SPECIFIC REQUIREMENT TO SUPPORT COMMISSIONING(CX) <br /> C408.1 Scope of mechanical For buildings with>240,000 Btu/h total <br /> systems output cooling capacity or>300,000 Btu/h <br /> commissioning total output heating capacity,indicate that all <br /> mechanical systems regardless of individual <br /> capacity are required to be commissioned;or <br /> provide building heating/cooling capacity <br /> calculation demonstrating eligibilty for <br /> exception <br /> Indicate that all systems,equipment and <br /> controls for which the WSEC requires control <br /> functions and/or configuration to perform <br /> specific functions are included in the Cx <br /> scope <br /> C408.1.1 Commissioning Indicate in plans and specifications that Cx <br /> C408.1.4.1 requirements in per C408 is required for all applicable <br /> construction mechanical systems <br /> documents <br /> Include general summary that includes at <br /> minimum:narrative description of activites, <br /> responsibilities of the Cx team,schedule of <br /> activities including verification of project <br /> close out documentation per C103.6,and <br /> conflict of interest plan(if required) <br /> Include in general summary that a Cx project <br /> report or Compliance Checklist(Figure <br /> C408.1.4.1)shall be completed by the <br /> Certified Cx Professional and provided to the <br /> owner prior to the final mechanical <br /> inspection. <br /> Page 24125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.