My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3006 RUCKER AVE PORT GARDNER BAY WINERY 2025-04-07
>
Address Records
>
RUCKER AVE
>
3006
>
PORT GARDNER BAY WINERY
>
3006 RUCKER AVE PORT GARDNER BAY WINERY 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 10:28:39 AM
Creation date
3/4/2025 12:41:04 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3006
Tenant Name
PORT GARDNER BAY WINERY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mechanical Requirements • • 25 of <br /> 2018 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by @2024 NEEA,All rights reserved <br /> The following information is necessary to check a mechanical permit application for compliance with the mechanical systems and equipment requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> C408.1.2.2 Functional Identify in plans and specifications the <br /> performance testing intended operation of all equipment and <br /> criteria controls during all modes of operation, <br /> including interfacing between new and <br /> existing-to-remain systems <br /> C408.2.2 Air system and Indicate in plans that air and fluid flow rates <br /> hydronic system shall be tested and balanced within the <br /> balancing tolerances defined in the specifications; <br /> indicate systems shall be balanced in a manner <br /> to first minimize throttling losses,then <br /> adjusted to meet design flow conditions <br /> C408.2.2.1 Air system balancing Indicate devices that provide the capability to <br /> devices balance all supply air outlets,zone terminals <br /> and air handling equipment requiring system <br /> balancing <br /> C408.2.2.2 Hydronic system Indicate devices that provide the capability to <br /> balancing devices isolate,balance and measure flow across all <br /> hydronic equipment requiring system <br /> balancing including heating and cooling coils <br /> and pumps;or exception applied <br /> PROJECT CLOSE OUT DOCUMENTATION <br /> YES C103.6 Documentation and Indicate in plans that project close out Site Plan <br /> project close out documentation and training of building <br /> submittal operations personnel is required for all <br /> requirements mechanical components,equipment and <br /> systems governed by this code;indicate close <br /> out documentation shall include:record <br /> documents,O&M manuals,applicable WSEC <br /> mechanical equipment compliance reports and <br /> calculations <br /> Page 25125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.