Laserfiche WebLink
16 Civil Plans CG.11-MB A Type II catch basin or a manhole shall be required when CB13 revised to a Type II. CJM <br /> the depth to the lowest pipe invert exceeds 5.5 feet, <br /> regardless of the pipe size [DCSS 4-2.3(3)7]. It appears <br /> that CB13 is exceeds 5.5 feet and should be Type II. <br /> 17 Civil Plans CG.06 Backup power must be provided with sufficient capacity to The pump is connected to the building power KJH <br /> run the pumps at max flow [DCSS 4-2.3(10)4]. which is covered by a whole building backup <br /> generator. <br /> 18 Civil Plans, CG.07A Provide a detail for the Filterra bioretention system with Filterra detail now included in the plan set. KJH <br /> Stormwater site-specific information. The email confirmation from Contech has <br /> Technical been added to the storm report. Because <br /> Memorandum Send the stormwater plans to the Filterra manufacturer to the unit is downstream of detention, Contech <br /> make sure there is no issue with the pump upstream, and has required the facility to be online 24- <br /> provide verification. hours followed by 24-hours offline. There are <br /> two facilities with separate pumps that are <br /> programed to cycle every 24-hours. <br /> 19 Civil Plans CG.07 BMP D.3— Provide ventilation pipes (minimum 12-inch The plans show an access manhole lid at all KJH <br /> diameter or equivalent) in all four corners of vaults to allow four corners of the vault which exceeds the <br /> for artificial ventilation prior to entry of maintenance 12-inch requirement. <br /> personnel into the vault. <br /> 20 Civil Plans CG.07 The minimum width of a notch allowed for use in the Model has been modified to match design KJH <br /> City of Everett is one quarter inch. [DCSS 4-2.3(6)2] drawings. Standard plans 415 and 416 <br /> Make sure to update the model for the notch. Also, reference added to detail sheet CG.07. <br /> change the orifice to 0.85" in the model as shown in <br /> the plans. <br /> • Show all dimensions as specified in Standard <br /> Drawings 415 and 416 for the flow control structure or <br /> call-out these drawings by reference. [DCSS 4- <br /> 2.3(6)3] <br /> Page 7 of 12 <br />