Laserfiche WebLink
21 Civil Plans CG.06 For the pump station, the access lid shall be equipped with Notes have been added to the pump station KJH <br /> a pick hole capable of being opened with a standard grate details on CG.06 <br /> hook or handles. If the lid is larger than a standard <br /> manhole lid, it shall be hinged and shall be capable of <br /> being opened and held open by a single individual. [DCSS <br /> 4-4.2(3)] <br /> 22 Other - Complete the Declaration of Covenant and Grant A signed and notarized copy of this form is KGS <br /> Easement form for Lot 2, which is located here: attached. Note that the form is revised per <br /> https://everettwa.gov/1985/Stormwater-Technical- directive by City of Everett to delete the <br /> Resources. [DCSS 4-4.2(5)] words "and Grant of Easement". <br /> We recommend removing "and Grant of Easement"from <br /> the title and footer. We have recently learned that the <br /> County Auditor is requiring the document to be recorded <br /> twice, once a covenant and again as an easement due to <br /> the title. We are in the process of updating our template. <br /> We can accept it either way, but it will save some cost and <br /> hassle to make the change. <br /> Page 8 of 12 <br />