My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 2/25/2025 Change Order 3
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction Inc 2/25/2025 Change Order 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 10:29:05 AM
Creation date
3/5/2025 10:25:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
2/25/2025
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Heather Magnuson
Subject / Project Title
Water Filter Plant Generator Replacement
Amendment/Change Order
Change Order
Amendment/Change Order Number
3
Tracking Number
0003541
Total Compensation
$216,361.81
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction Inc 11/13/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />18802 80th Avenue South <br />Kent, WA 98032 <br />Phone: (425) 203-9800 <br />www.shinnmechanical.com <br /> <br /> <br />www.ShinnMechanical.com <br /> <br />October 9, 2024 <br /> <br /> <br />Re: IMCO – WFP Generator - Everett <br />Job Number 22-3706 <br />22-3706 - COP #009 Location 2 Pneumatic to Electric Actuators <br /> <br />To: IMCO Construction <br />2116 Buchanan Loop <br /> Ferndale, WA 98248 <br /> <br />Attn: Mitchell Sorestad <br /> <br />Description: We are pleased to present you with our proposal to provide replacement of existing <br />pneumatic actuators with Belimo electric actuators. Material and Installation of Belimo <br />actuators and required accessories only. <br /> <br />Cost: $ 14,656.00 <br /> <br />Exclusions: - Construction Schedule Impacts <br />- Electrical <br />- Overtime or Shift Labor <br />- Washington State Sales Tax <br /> <br />If you have any questions associated with this proposal, please feel free to contact us at (425) 203-9800. <br /> <br />Sincerely, <br /> <br /> <br /> <br /> <br />Trey Shinn <br />Shinn Mechanical, Inc. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.