Laserfiche WebLink
SHINN MECHANICAL, INC. <br />Job Cost History Report From Inception To 12/19/24 <br />Includes Posted Transactions Only <br />11/03/24 EQ 2022 FORD F-150 MATT SIMMONSV-115 62.568.00 <br />11/17/24 EQ 2022 FORD F-150 MATT SIMMONSV-115 62.568.00 <br />11/24/24 EQ 2022 FORD F-150 MATT SIMMONSV-115 62.568.00 <br />12/08/24 EQ 2022 FORD F-150 MATT SIMMONSV-115 62.568.00 <br />11/03/24 PR MATT M SIMMONS 903.528.00 <br />11/17/24 PR MATT M SIMMONS 903.528.00 <br />11/24/24 PR MATT M SIMMONS 903.528.00 <br />12/08/24 PR MATT M SIMMONS 931.958.00 <br />10/28/24 AP ATS AUTOMATION 9,417.9049.00 <br />11/19/24 AP ATS AUTOMATION 756.808.00 <br />12/16/24 AP HOME DEPOT 91.28 <br />SIMMAT <br />SIMMAT <br />SIMMAT <br />SIMMAT <br />ATSAUT <br />ATSAUT <br />HOMDEP <br />Job: 22-3706 WFP-GENERATOR-Everett <br />Phase: 5000-0009 COP #009 Pneumatic to Ele Cost Type: E EQUIPMENT <br />32.00 0.00 250.24 <br />Phase: 5000-0009 COP #009 Pneumatic to Ele Cost Type: L LABOR <br />32.00 0.00 3,642.51 <br />Phase: 5000-0009 COP #009 Pneumatic to Ele Cost Type: M MATERIAL <br />0.00 57.00 10,265.98 <br />64.00 57.00 14,158.73 <br />Date <br />Tran <br />Type Reference Description Additional Information Hours Quantity Amount <br />UnPosted? <br />Unit of Measure <br />Rate: 7.82 <br />Rate: 7.82 <br />Rate: 7.82 <br />Rate: 7.82 <br />Check# E82223 <br />Check# E82418 <br />Check# E82517 <br />Check# E82717 <br />Invoice I006697 dated 10/16/24 PO 112359 5000-0009 <br />Invoice I006720 dated 11/11/24 PO 112359 Belimo #ZG-EFB <br />Invoice 12/05/24 dated 12/ 5/24 <br />Total for Job: 22-3706 WFP-GENERATOR-EverettJob 22-3706 Recap <br /> Printed by 02L as of 12/19/24 1:25PM Page 1 <br />22-3706 <br />50000009 <br />ALL <br />AP, EQ, GL, IC, JC, PR, OH <br />ALL <br />ALL <br />ALL <br />ALL <br />ALL <br />ALL <br />Active, Inactive, Complete <br />Active, Inactive, Complete <br />No <br />No <br />Report Selections:Job: <br />Phase: <br />Cost Type: <br />Tran. Type: <br />Job Status: <br />Vendor: <br />Employee: <br />Inv. Item: <br />Phase Status: <br />Division: <br />Customer: <br />Draw Appl. #: <br />A/P Contract Labor Hours? <br />Master Job? <br />Subtotal for Phase: 5000-0009 COP #009 Pneumatic to Ele Cost Type: E EQUIPMENT <br />Subtotal for Phase: 5000-0009 COP #009 Pneumatic to Ele Cost Type: L LABOR <br />Subtotal for Phase: 5000-0009 COP #009 Pneumatic to Ele Cost Type: M MATERIAL <br />Amount <br />32.00 <br />32.00 <br />32.00 <br />32.00 <br />0.00 <br />0.00 <br />64.00 <br />64.00 <br />250.24 <br />250.24 <br />3,642.51 <br />3,642.51 <br />10,265.98 <br />10,265.98 <br />14,158.73 <br />14,158.73 <br />Total <br />5000-0009 COP #009 Pneumatic <br />to Ele <br />Total <br />Hours <br />MATERIALLABOREQUIPMENT