MLE 325-500 – Everett PD Page 5 of 16
<br />Washington state, and who have completed an RBS course acceptable to State Parks (BMLE
<br />or equal).
<br />Wages and benefits for officers or deputies who possess a Washington State Peace Officers
<br />Certification, are fully commissioned to enforce the laws of Washington state, and who have not
<br />completed a BMLE course are acceptable only when working with an RBS trained officer and
<br />when the agency has a written two-officer policy for officers on marine patrol for the purpose of
<br />safety.
<br />9.1.3 Provision of instructors for the ‘Adventures in Boating’ course that qualifies graduates for the
<br />required mandatory boater education card. Costs may include classroom supplies, light
<br />refreshments, other goods, and services necessary to promote and teach classes, and officer
<br />salaries, benefits, and wages. Officer salaries will only be reimbursed for those officers who
<br />have successfully completed State Parks ‘Adventures in Boating Instructor’ Training Class and
<br />are listed in our files.
<br />9.1.4 Any equipment expenditures over $2,500.00 must receive authorization from State Parks prior
<br />to purchase.
<br />9.1.5 Educational publications which promote RBS education that are already prepared, or the
<br />creation, design, and printing of new publications.
<br />9.1.6 Other items as deemed by MLE to be necessary to complete the project.
<br />9.1.7 Support of the Basic MLE Academy by agencies who provided MLE recognized instructors.
<br />9.2 Non-Allowable Costs and Expenditures. The following items are ineligible for reimbursement:
<br />9.2.1 Bullet proof vests are beneficial; however, equipment of this nature is not essential for meeting
<br />the established program criteria, nor is it related to the performance of the RBS program
<br />mission, therefor these are considered a local agency responsibility to purchase.
<br />9.2.2 Equipment used in recovery operations (dive equipment, etc.) while being used in an RBS
<br />search or investigation mode is 100% eligible. Once this equipment is used for recovery
<br />operations it must be prorated between RBS missions and recovery missions.
<br />9.2.3 Handheld or portable night vision, FLIR or thermal imaging devices are a 100% allowable
<br />expense while in RBS patrol, search, or investigation mode. Once this equipment is used for
<br />recovery operations it must be prorated. Permanently mounted and electrically wired FLIR and
<br />thermal imaging devices are 100% allowable expenses.
<br />9.2.4 Homeland Security missions (weapons, etc.), or any other equipment determined as unrelated
<br />by the boating program is not an allowable expense.
<br />9.2.5 Firefighting equipment is not an allowable expense.
<br />9.2.6 Any equipment or vehicles not 100% dedicated to the RBS mission must be prorated,
<br />documenting the amount of time the equipment or vehicle was dedicated to the program.
<br />9.2.7 Operating costs for law enforcement vessels boats (staff, fuel, fluids, repairs, maintenance) or
<br />operating costs for boats used to service floating restrooms (staff, fuel, fluids).
<br />9.2.8 Documented staff or contract labor associated with routine custodial and non-routine
<br />maintenance and repairs, the cost of that person operating or maintaining the system.
<br />9.2.9 Other items as deemed by MLE to be unnecessary to complete the project.
<br />9.2.10 Entertainment Costs. In accordance with 2 CFR 200, the cost of amusement, diversion, social
<br />activities, ceremonials, and costs relating thereto, such as meals, lodging, rentals,
<br />transportation, gratuities, and alcoholic beverages are not allowable expenses.
<br />9.2.11 Prior Costs. MLE will not reimburse Subrecipient for any costs incurred prior to the effective
<br />date of this agreement as identified in Section 5 – Agreement Term, Effective Date, & Duration.
<br />SECTION 10: Terms of Payment
<br />10.1 Reimbursement Requests. MLE shall disburse grant funds to the Subrecipient according to the
<br />following:
<br />a. Prior to project plans, specifications, and cost estimate(s), statement of work, request for
<br />proposal or other documentation for the project, documents must be in form and substance
<br />satisfactory to MLE.
<br />b. Reimbursement requests must be submitted quarterly on the approved MLE Grant
|