My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA Department of Commerce 1/28/2025
>
Contracts
>
6 Years Then Destroy
>
2025
>
WA Department of Commerce 1/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2025 8:29:49 AM
Creation date
3/5/2025 2:48:50 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA Department of Commerce
Approval Date
1/28/2025
Council Approval Date
12/4/2024
End Date
7/7/2025
Department
Facilities & Property Management
Department Project Manager
Karen Schraven
Subject / Project Title
WAEVCP Grant for Public EV Chargers at Two Libraries
Tracking Number
0004714
Total Compensation
$442,000.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />11 <br />Data: Replica trip volume data, uses total modeled daily trips to <br />points of interest within proposed site’s parcel or closest parcel <br />within 0.25 of a mile. <br />Power level-to- <br />park time fit <br />Avg. dwell tfme (L2) <br />Assumptfons: Use 80% of 300- <br />mile range, 25 miles per hour <br /> <br />4-10 hours – 10 points <br />2-4 hours – 8 points <br />1-2 or 10-12 hours – 5 points <br />30 min to 1 hour, 12-16 hours – 2 <br />points <br />Less than 30 min, 16+ hours – 0 <br />points <br />Avg. dwell tfme (DCFC) <br />Assumptfons: 30 minutes to <br />charge 80% <br /> <br />Less than 45 minutes – 10 <br />points <br />45-60 minutes – 6 points <br />60-90 minutes – 3 points <br />More than 90 minutes – 0 <br />points <br /> <br />10* 10% <br />Power level-to- <br />park time fit <br />continued <br />Avg. dwell tfme (Combinatfon) <br />Calculated by charging port and then averaged for site score, <br />rounding to nearest whole number (i.e., if a site will have 4 L2 and <br />2 DCFC, and the avg dwell tfme is 60 minutes, the score will be (4 <br />x 5) + (2 x 6) = 32/6 = 5 <br /> <br />Data: Replica dwell time data, uses median dwell time of all <br />modeled daily trips to points of interest within proposed site’s <br />parcel or closest parcel within 0.25 of a mile. <br />Same <br />as row <br />above <br />Same as <br />row <br />above <br />Overburdened <br />community <br />9-10, federally-recognized tribal lands and propertfes – 20 points <br />7-8 – 16 points <br />1-6 – Multfply score by 2 <br /> <br />Data: WTN EHD <br />20 20% <br />Labor Commitment to electrician apprentfceship utflizatfon rates: <br />25% - 10 points <br />20% - 5 points <br />15% - 0 points (Minimum Requirement) <br />10 10% <br />Commitment to use Project Labor Agreement with constructfon <br />workers (Y or N) <br />5 5% <br />Commitment to use OMWBE contractor (Y or N) <br />Find a contractor on the directory: <br />https://omwbe.wa.gov/directory-certffied-businesses <br />5 5% <br />Total 100 * 100% <br /> <br />Fleet Depots & Workplaces <br />Factor Metric Points Percent <br />Site type Public schools – 30 points 30 30% <br />Docusign Envelope ID: 9CA32415-9130-4D24-B542-1ED1AA5501F1
The URL can be used to link to this page
Your browser does not support the video tag.