Laserfiche WebLink
<br /> <br />13 <br />$1,000 per parking spot/stub-out and is limited to a maximum of $3,000 per site. The equity and future- <br />proofing adders are included in the maximum award calculatfon. <br /> If eligible project costs exceed the maximum award, grantees and partners should plan to cover <br />the remainder. Other programs can be used to fund this remainder. <br /> If costs end up being lower than maximum award, then the maximum will not be disbursed in <br />the full amount. <br /> <br />Award Caps <br />Equipment <br />Type <br />Base Award Cap per <br />Charging Port <br />Equity Adder per <br />Charging Port* <br />Adder - Future Proofing <br />Level 2 $7,500 $2,500 $1,000 per parking spot stub-out, up to $3,000 <br />per site <br />DCFC $85,000 $25,000 $1,000 per parking spot stub-out, up to $3,000 <br />per site <br />* Sites that score a 9 or 10 on the EHD layer of the Mapping Tool, or are tribal locatfons, are eligible for the <br />Equity Adder. <br /> <br />Docusign Envelope ID: 9CA32415-9130-4D24-B542-1ED1AA5501F1