My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHC Consultants LLC 2/27/2025 (2)
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BHC Consultants LLC 2/27/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 3:36:37 PM
Creation date
3/5/2025 3:36:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BHC Consultants LLC
Approval Date
2/27/2025
Council Approval Date
2/26/2025
End Date
12/31/2026
Department
Public Works
Department Project Manager
Brian Doolan
Subject / Project Title
Chlorine Contact Channel Isolation Valve Replacement
Tracking Number
0004722
Total Compensation
$96,806.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett WPCF Chlorine Contact Channel Isolation Valve Replacement <br /> <br /> Scope of Services 3 <br />4. Prepare monthly invoices formatted in accordance with contract terms. <br />5. Project Manager will attend monthly project management meetings with the client and <br />will review project scope, schedule, and budget issues. <br />6. Provide QC review of deliverables prior to delivery in accordance with BHC QA/QC <br />policies. <br />7. Host web-conference meetings, if needed. <br />8. Prepare Scope of Services, Schedule, and Budget for engineering services during <br />construction. <br />City of Everett Responsibilities <br />1. Attend project management meetings. <br />2. Processing and payment of invoices in accordance with the Professional Services <br />Agreement. <br />3. Review and process contract change requests and amendments, if needed. <br />Assumptions and Meetings <br />1. Project management duties are limited to those associated with design and bid <br />assistance with an assumed duration of up to ten (10) months. <br />2. One project management meeting will be held via phone per month. One hour of project <br />manager time will be required for each meeting including preparation, attendance, <br />follow-up, and notes. <br />3. Invoices will be BHC standard invoice format. Each invoice will have a distinct number <br />for tracking purposes. <br />4. Copies of subconsultant invoice statements, as applicable, will be provided with monthly <br />invoices. Incidental miscellaneous expenses (travel reimbursement, etc.) do not require <br />submittal of backup statements. <br />Deliverables <br />1. Scope of Services, Schedule (Gantt chart in MS Project or Excel), and Budget (e-mailed <br />Adobe PDF file) for engineering services during construction. <br />2. Monthly status reports and invoices (e-mailed Adobe PDF files). <br />3. Written summary notes (e-mail) describing decisions, direction, action items, or issues <br />associated with scope and budget discussed during monthly project management <br />meetings. <br />Task 200 – Permitting Support <br />Objectives <br />It is assumed no permitting support will be required for the valve replacement at the WPCF. <br />BHC Services <br />None. <br />City of Everett Responsibilities <br />None.
The URL can be used to link to this page
Your browser does not support the video tag.