My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHC Consultants LLC 2/27/2025 (2)
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BHC Consultants LLC 2/27/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 3:36:37 PM
Creation date
3/5/2025 3:36:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BHC Consultants LLC
Approval Date
2/27/2025
Council Approval Date
2/26/2025
End Date
12/31/2026
Department
Public Works
Department Project Manager
Brian Doolan
Subject / Project Title
Chlorine Contact Channel Isolation Valve Replacement
Tracking Number
0004722
Total Compensation
$96,806.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett WPCF Chlorine Contact Channel Isolation Valve Replacement <br /> <br /> Scope of Services 8 <br />Fee <br />The consultant fee estimated for Tasks 100, 200, 300, 400, and 600 only, including <br />subconsultants and other direct costs (ODCs) is $96,806. A detailed breakdown of the fee <br />estimate is attached and labeled Exhibit B. <br />Expenses are based on the following Rates: <br />• Mileage: IRS rate (currently $0.70 per mile) <br />• Printing: <br />o B&W 8.5x11: $0.15 per page <br />o B&W 11x17: $0.30 per page <br />Schedule <br />The schedule lengths for Tasks 100, 200, 300, and 400 are as follows: <br />• Task 100: Project Management 10 months <br />• Task 200: Permitting Support 8 months <br />• Task 300: Design 8 months <br />o Task 301: Preliminary Design 2 months <br />o Task 301: 50 Percent Design 4 months (overlap with Task 301) <br />o Task 302: 90 Percent Design 3 months <br />o Task 303: Final Construction Bid Documents 1 month <br />• Task 400: Bid Assistance 2 months <br />
The URL can be used to link to this page
Your browser does not support the video tag.