My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHC Consultants LLC 2/27/2025 (2)
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BHC Consultants LLC 2/27/2025 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 3:36:37 PM
Creation date
3/5/2025 3:36:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BHC Consultants LLC
Approval Date
2/27/2025
Council Approval Date
2/26/2025
End Date
12/31/2026
Department
Public Works
Department Project Manager
Brian Doolan
Subject / Project Title
Chlorine Contact Channel Isolation Valve Replacement
Tracking Number
0004722
Total Compensation
$96,806.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett WPCF Chlorine Contact Channel Isolation Valve Replacement <br /> <br /> Scope of Services 7 <br />3. Electronic copy (Adobe PDF format) of the 50 Percent and 90 Percent Design Submittal <br />Record of Comment for the combined project. <br />4. Electronic copy (Adobe PDF format) of Final Construction Bid Documents for the <br />combined project, stamped and signed. <br />5. Electronic copy (Adobe PDF format) of meeting notes for the 50 and 90 percent review <br />meetings for the combined project. <br />Task 400 – Bid Assistance <br />Objectives <br />This effort shall assist the City during the bidding process. <br />BHC Services <br />1. Up to two (2) BHC staff members will attend a pre-bid meeting for the combined project. <br />Budget for this meeting is split evenly between the two scopes of services. <br />2. Provide technical review and responses to bidder questions. <br />3. Assist the City in preparing addenda for the combined project. Budget for this work is <br />split evenly between the two scopes of services. <br />4. Assist the City with verifying bids for the combined project. Budget for this work is split <br />evenly between the two scopes of services. <br />City of Everett Responsibilities <br />1. Advertise the combined project in the DJC and local newspaper(s). <br />2. Submit bid documents and addenda for the combined project to Builder’s Exchange. <br />Assumptions and Meetings <br />1. There will be one (1) pre-bid meeting for the combined project. <br />2. BHC will not need to attend the bid opening. <br />3. BHC will respond to up to twelve (12) bidder questions for the combined project. <br />4. BHC will help prepare up to two (2) addenda for the combined project. <br />Deliverables <br />1. Responses to bidder questions, as required. <br />2. Draft addenda, as needed. <br />Task 500 – Engineering Services During Construction <br />To be included later as an amendment to the original agreement. <br />Task 600 – Management Reserve <br />Objective <br />This task has been included to cover additional work identified by the City not included in the <br />Scope of Services. An amount totaling 10% of the contract subtotal is assigned to this task.
The URL can be used to link to this page
Your browser does not support the video tag.