Laserfiche WebLink
Areas on the site that have potential erosion problems: <br />N/A <br />Locations where surface water leaves the site: <br />No water will leave the site <br />Task 2: Select Construction Best Management Practices (BMPs) to be used on your project <br />All new development and redevelopment projects are responsible for preventing erosion and sedimentation <br />during construction. Each of the 13 requirements below contains a list of Best Management Practices (BMPs) <br />that are accepted by the Washington State Department of Ecology (Ecology) for satisfying each requirement. <br />The BMPs below are the most common. For a complete selection of BMPs please see Volume 11 of Ecology's <br />Stormwater Management Manual for Western Washington. <br />Each of the 13 Elements below must be considered in the SWPPP. Select all <br />BMPs that you will be using to satisfy each requirement. All requirements must <br />0 have at least one item selected. <br />Element 1. Preserve vegetation/mark clearing limits: <br />IN BMP C 101: Preserving Natural Vegetation <br />❑ BMP C 102: Buffer Zones <br />❑ BMP C 103: High Visibility Plastic or Metal Fence <br />❑ OtherPerthe SWMMWW: <br />❑ Not applicable to my proposed project <br />Explain: <br />Element 2. Establish construction: <br />❑ BMP C 105: Stabilized Construction Entrance/Exit <br />❑ BMP C 106: Wheel Wash <br />0 BMP C 107: Construction Road/Parking Area Stabilization <br />❑ Other Per the 9 T11MM. <br />❑ Not applicable to my proposed project <br />Explain: <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in 10 <br />the Combined Sewer Area-April2021 <br />