My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 LAUREL DR 2025-03-12
>
Address Records
>
LAUREL DR
>
505
>
505 LAUREL DR 2025-03-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 8:17:51 AM
Creation date
3/7/2025 8:48:49 AM
Metadata
Fields
Template:
Address Document
Street Name
LAUREL DR
Street Number
505
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Step 5. Construction Stormwater Pollution Prevention <br />(SWPPP) <br />All new development and redevelopment projects are responsible for preventing erosion and discharge of <br />sediment and other pollutants into receiving waters. A Construction Stormwater Pollution Prevention Plan <br />(Construction SWPPP) is designed to be a stand-alone document that addresses construction stormwater <br />management concerns. A copy of this SWPPP is required to be kept by the contractor performing the work at <br />the jobsite for reference and updating during the duration of construction. <br />Task 1: Describe the project during construction <br />(You may attach a narrative that answers the following questions) <br />Nature and purpose of the construction project: <br />Install Pool and Patio <br />Adjacent areas, including streams, lakes, wetlands, residential areas, and roads that might be <br />affected by the construction project: <br />None, nothing will leave the site. <br />How upstream drainage areas may affect the site: <br />N/A <br />Downstream drainage leading from the site to a receiving body of water: <br />N/A <br />Critical areas that receive runoff from the site up to one -quarter mile away: <br />None <br />Special requirements and provisions for working near or within critical areas: <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in <br />the Combined Sewer Area -April 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.