My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
>
Address Records
>
MAPLE ST
>
2930
>
KAISER PERMANENTE
>
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2025 8:59:13 AM
Creation date
3/7/2025 2:47:49 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Tenant Name
KAISER PERMANENTE
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KAISER PERMANENTE <br />ASC & Clinic (HUB) <br />Everett, WA <br />Site Prep #1 Electrical Service <br />March 18, 2020 <br />Proiect No. 19.05002.00 <br />B. Locate wall, floor and ceiling fire ratings from architectural drawings for appropriate hourly <br />rating of combination fire/smoke dampers or fire dampers shown on mechanical <br />drawings. <br />3.2 EQUIPMENT INSTALLATION - COMMON REQUIREMENTS <br />A. Install equipment to provide maximum possible headroom, if mounting heights are not <br />indicated. <br />B. Install equipment according to approved submittal data. <br />C. Install equipment level and plumb, parallel and perpendicular to other building systems <br />and components in exposed interior spaces, unless otherwise indicated. <br />D. Install mechanical equipment to facilitate service, maintenance, and repair or <br />replacement of components. Connect equipment for ease of disconnecting, with <br />minimum interference to other installations. Extend grease fittings to accessible <br />locations. <br />E. Install equipment giving right of way to piping installed at required slope. <br />3.3 PAINTING AND FINISHING <br />A. Refer to Division 09 for paint materials, surface preparation, and application of paint. <br />B. Apply paint to exposed piping, ductwork and supports according to the following, unless <br />otherwise indicated: <br />1. Interior, Ferrous Supports: Use semigloss, acrylic -enamel finish. Include finish <br />coat over enamel undercoat and primer. Paint not required on interior galvanized <br />supports. <br />2. Exterior, Ferrous Piping and ductwork: Use semigloss, acrylic -enamel finish. <br />Include two finish coats over rust -inhibitive metal primer. <br />3. Exterior, Ferrous Supports: Use semigloss, acrylic -enamel finish. Include two <br />finish coats over rust -inhibitive metal primer. <br />C. Do not paint piping specialties with factory -applied finish. <br />D. Damage and Touchup: Repair marred and damaged factory -painted finishes with <br />materials and procedures to match original factory finish. <br />3.4 ERECTION OF METAL SUPPORTS AND ANCHORAGE <br />A. Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and <br />elevation to support and anchor mechanical materials and equipment. <br />B. Field Welding: Comply with AWS D1.1, "Structural Welding Code --Steel." <br />3.5 CUTTING AND PATCHING <br />A. General: Perform cutting and patching in accordance with Division 01. In addition to the <br />requirements specified in Division 01, the following requirements apply: <br />1. Protection of Installed Work: During cutting and patching operations, protect <br />adjacent installations. <br />B. Perform cutting, fitting, and patching of mechanical equipment and materials required to: <br />1. Uncover Work to provide for installation of ill-timed Work. <br />2. Remove and replace defective Work. <br />COMMON MECHANICAL MATERIALS AND METHODS 23 05 00 - 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.