Laserfiche WebLink
KAISER PERMANENTE <br />ASC & Clinic (HUB) <br />Everett, WA <br />Site Prep #1 Electrical Service <br />March 18, 2020 <br />Proiect No. 19.05002.00 <br />B. Locate wall, floor and ceiling fire ratings from architectural drawings for appropriate hourly <br />rating of combination fire/smoke dampers or fire dampers shown on mechanical <br />drawings. <br />3.2 EQUIPMENT INSTALLATION - COMMON REQUIREMENTS <br />A. Install equipment to provide maximum possible headroom, if mounting heights are not <br />indicated. <br />B. Install equipment according to approved submittal data. <br />C. Install equipment level and plumb, parallel and perpendicular to other building systems <br />and components in exposed interior spaces, unless otherwise indicated. <br />D. Install mechanical equipment to facilitate service, maintenance, and repair or <br />replacement of components. Connect equipment for ease of disconnecting, with <br />minimum interference to other installations. Extend grease fittings to accessible <br />locations. <br />E. Install equipment giving right of way to piping installed at required slope. <br />3.3 PAINTING AND FINISHING <br />A. Refer to Division 09 for paint materials, surface preparation, and application of paint. <br />B. Apply paint to exposed piping, ductwork and supports according to the following, unless <br />otherwise indicated: <br />1. Interior, Ferrous Supports: Use semigloss, acrylic -enamel finish. Include finish <br />coat over enamel undercoat and primer. Paint not required on interior galvanized <br />supports. <br />2. Exterior, Ferrous Piping and ductwork: Use semigloss, acrylic -enamel finish. <br />Include two finish coats over rust -inhibitive metal primer. <br />3. Exterior, Ferrous Supports: Use semigloss, acrylic -enamel finish. Include two <br />finish coats over rust -inhibitive metal primer. <br />C. Do not paint piping specialties with factory -applied finish. <br />D. Damage and Touchup: Repair marred and damaged factory -painted finishes with <br />materials and procedures to match original factory finish. <br />3.4 ERECTION OF METAL SUPPORTS AND ANCHORAGE <br />A. Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and <br />elevation to support and anchor mechanical materials and equipment. <br />B. Field Welding: Comply with AWS D1.1, "Structural Welding Code --Steel." <br />3.5 CUTTING AND PATCHING <br />A. General: Perform cutting and patching in accordance with Division 01. In addition to the <br />requirements specified in Division 01, the following requirements apply: <br />1. Protection of Installed Work: During cutting and patching operations, protect <br />adjacent installations. <br />B. Perform cutting, fitting, and patching of mechanical equipment and materials required to: <br />1. Uncover Work to provide for installation of ill-timed Work. <br />2. Remove and replace defective Work. <br />COMMON MECHANICAL MATERIALS AND METHODS 23 05 00 - 11 <br />