My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
>
Address Records
>
MAPLE ST
>
2930
>
KAISER PERMANENTE
>
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2025 8:59:13 AM
Creation date
3/7/2025 2:47:49 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Tenant Name
KAISER PERMANENTE
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KAISER PERMANENTE Site Prep #1 Electrical Service <br />ASC & Clinic (HUB) March 18, 2020 <br />Everett, WA Project No. 19.05002.00 <br />C. Final Report Contents: In addition to the certified field report data, include the following: <br />1. Fan curves. <br />2. Manufacturers' test data. <br />3. Field test reports prepared by system and equipment installers. <br />4. Other information relative to equipment performance, but do not include <br />approved Shop Drawings and Product Data. <br />D. General Report Data: In addition to the form titles and entries, include the following data <br />in the final report, as applicable: <br />1. Title page. <br />2. Name and address of testing, adjusting, and balancing Agent. <br />3. Project name. <br />4. Project location. <br />5. Architect's name and address. <br />6. Engineer's name and address. <br />7. Contractor's name and address. <br />8. Report date. <br />9. Signature of testing, adjusting, and balancing Agent who certifies the report. <br />10. Summary of contents, including the following: <br />a. Design versus final performance. <br />b. Notable characteristics of systems. <br />C. Description of system operation sequence if it varies from the Contract <br />Documents. <br />11. Nomenclature sheets for each item of equipment. <br />12. Notes to explain why certain final data in the body of reports vary from design <br />values. <br />13. Test conditions for fans and pump performance forms, including the following: <br />a. Fan drive settings, including settings and percentage of maximum pitch <br />diameter. <br />b. Inlet vane settings for variable -air -volume systems. <br />C. Other system operating conditions that affect performance. <br />E. System Diagrams: Include schematic layouts of air and hydronic distribution systems. <br />Present with single -line diagrams and include the following: <br />1. Quantities of exhaust airflows. <br />2. Duct, outlet, and inlet sizes. <br />F. Fan Test Reports: For supply, return, and exhaust fans, include the following: <br />1. Fan Data: Include the following: <br />a. System identification. <br />b. Location. <br />C. Make and type. <br />d. Model number and size. <br />e. Manufacturer's serial number. <br />f. Arrangement and class. <br />g. Sheave make, size in inches, and bore. <br />h. Sheave dimensions, center -to -center and amount of adjustments in <br />inches. <br />2. Motor Data: Include the following: <br />a. Make and frame type and size. <br />b. Horsepower and rpm. <br />C. Volts, phase, and hertz. <br />TESTING, ADJUSTING, AND BALANCING FOR MECHANICAL 23 05 93 - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.