Laserfiche WebLink
KAISER PERMANENTE Site Prep #1 Electrical Service <br />ASC & Clinic (HUB) March 18, 2020 <br />Everett, WA Project No. 19.05002.00 <br />d. Full -load amperage and service factor. <br />e. Sheave make, size in inches, and bore. <br />f. Sheave dimensions, center -to -center and amount of adjustments in <br />inches. <br />g. Number of belts, make, and size. <br />3. Test Data: Include design and actual values for the following: <br />a. Total airflow rate in cfm. <br />b. Total system static pressure in inches wg. <br />C. Fan rpm. <br />d. Discharge static pressure in inches wg. <br />e. Suction static pressure in inches wg. <br />3.9 ADDITIONAL TESTS <br />A. Within 90 days of completing testing, adjusting, and balancing, perform additional testing <br />and balancing to verify that balanced conditions are being maintained throughout and to <br />correct unusual conditions. <br />B. Seasonal Periods: If initial testing, adjusting, and balancing procedures were not <br />performed during near -peak summer and winter conditions, perform additional <br />inspections, testing, and adjusting during near -peak summer and winter conditions. <br />END OF SECTION 23 05 93 <br />TESTING, ADJUSTING, AND BALANCING FOR MECHANICAL 23 05 93 - 8 <br />