Laserfiche WebLink
KAISER PERMANENTE <br />ASC & Clinic (HUB) <br />Everett, WA <br />Site Prep #1 Electrical Service <br />March 18, 2020 <br />Proiect No. 19.05002.00 <br />5. Digital Controller Start-up and Memory Test: Demonstrate that programming is <br />not lost after a power failure, and digital controllers automatically resume proper <br />control after a power failure. <br />6. Surge Protection: Show that surge protection, meeting the requirements of this <br />specification, has been installed on incoming power to the digital controllers and <br />on communication lines. <br />7. Application Software Operation Test: Test compliance of the application for: <br />a. Ability to communicate with the digital controllers, uploading and <br />downloading of programs <br />b. Text editing program: Demonstrate the ability to edit the control program <br />off line <br />C. Reporting of alarm conditions: Cause alarm conditions for each alarm, <br />and ensure that workstation receives alarms <br />d. Reporting trend and status reports: Demonstrate ability of software to <br />receive and save trend and status reports <br />e. Execution of Sequence of Operation: Furnish graphic trends to show the <br />sequence of operation is executed in correct order. Demonstrate the <br />HVAC system operates properly through the complete sequence of <br />operation, for example seasonal, optimal start/warm-up, and <br />occupied/unoccupied modes of operation. Demonstrate proper control <br />system response for abnormal conditions for which there is a specified <br />response by simulating these conditions. Demonstrate hardware <br />interlocks and safeties work. Demonstrate the control system performs <br />the correct sequence of control after a loss of power <br />f. Control Loop Stability and Accuracy: Furnish graphic trends of control <br />loops to demonstrate the control loop is stable and that set point is <br />maintained. Control loop response shall respond to set point changes <br />and stabilize within 1 minute <br />g. Opposite Season Test: Testing shall be repeated for opposite season. <br />B. Document all tests with detailed results. Provide statement that all corrective action <br />taken. Include test report in Operation and Maintenance Manuals. <br />3.7 TRAINING <br />A. Upon substantial completion of the mechanical system work, furnish the services of a <br />competent technician regularly employed by the DDC manufacturer for the instruction of <br />facility personnel in the operation and maintenance of each DDC system at project site. <br />Provide a minimum of 40 hours for training. Coordinate with Owner for number of <br />personnel, date, time, and location. Multiple training times may be necessary to <br />accommodate different working shifts. <br />B. Furnish a written test plan and training schedule for approval 15 days prior to instructing <br />operating personnel including the following: <br />1. Recommended training schedule for operator's workstation, standalone DDC <br />controllers, Application specific digital controllers and field components. <br />2. List of all training materials, aids, etc. <br />3. List of customer training schools offered by the DDC manufacturer. <br />C. Provide all training and materials necessary for each facility personnel, including: <br />1. Operations and Maintenance Manual <br />2. As -Built control diagrams <br />3. Detailed description of the system <br />4. Complete listing, graphical logic diagrams of all software programs required to <br />perform the sequence of operation <br />INSTRUMENTATION AND CONTROLS FOR HVAC 23 09 00 - 12 <br />