Laserfiche WebLink
KAISER PERMANENTE Site Prep #1 Electrical Service <br />ASC & Clinic (HUB) March 18, 2020 <br />Everett, WA Project No. 19.05002.00 <br />5. Commands, operating and troubleshooting instruction and routine maintenance <br />procedures. <br />6. Theory of operations <br />7. Hardware architecture <br />8. Operation of system <br />9. Operator Commands <br />10. Control sequence programming <br />11. Data base entry <br />12. Reports and logs <br />13. Alarm reports <br />14. Diagnostics. <br />15. Physical layout of each piece of hardware <br />16. Troubleshooting and diagnostics procedures <br />17. Repair instructions <br />18. Preventive maintenance procedures and schedules <br />19. Calibration procedures. <br />D. Provide [8] hours of additional training 3 and 6 months after project completion. Training <br />to address specific topics that the facility personnel need to discuss and to answer <br />questions concerning operation of the system. <br />PART 4 - SEQUENCE OF OPERATION AND DDC POINT LIST <br />A. Sequence of operations and point list are indicated on drawings. <br />B. Controls shall be by the DDC system unless indicated to be by local controls. <br />C. DDC system shall schedule each system or zone independently per owner's operating <br />schedule. Operating schedules shall be confirmed with Owner and adjusted as <br />necessary <br />D. Additional points shall be provided to execute the sequence of operations. <br />END OF SECTION 23 09 00 <br />INSTRUMENTATION AND CONTROLS FOR HVAC 23 09 00 - 13 <br />