My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
>
Address Records
>
MAPLE ST
>
2930
>
KAISER PERMANENTE
>
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2025 8:59:13 AM
Creation date
3/7/2025 2:47:49 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Tenant Name
KAISER PERMANENTE
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KAISER PERMANENTE Site Prep #1 Electrical Service <br />ASC & Clinic (HUB) March 18, 2020 <br />Everett, WA Project No. 19.05002.00 <br />7) Instruction certificates — certificates of compliance with Sections <br />specific training and instruction programs. <br />8) All other items as may be specified/required by this Section and <br />the Contract Documents. <br />K. Record Documents: <br />1. Maintain one complete set of blueline prints and specifications at the job site <br />exclusively for recording deviations from the drawings which are necessary <br />because of job conditions, request for information and/or approved change orders. <br />Record locations and depths of buried and concealed conduits or other systems <br />components from fixed, easily identifiable objects, such as building walls or other <br />fixed physical objects. Where conduits are concealed in walls or other fixed <br />physical objects, indicate distances from building corners or other building features <br />not likely to be disturbed by fixture alterations. Drawings, specifications (as-builts) <br />and approved submittals. <br />2. Where the project uses a BIM model the Contractor shall keep the model updated <br />in a similar fashion, maintaining the current project record as described in (a), <br />above and submit, an addition to all other requirements of this Section and other <br />provisions of the Contract Documents a complete and accurate BIM model for the <br />project. <br />3. Prior to Substantial Completion, obtain from the Architect a complete set of <br />electronic CAD drawings. Record all revisions to these drawings to indicate as - <br />built conditions. Indicate all changes, including RFI's, on this set of documents. <br />Submit one set of blueprints of these revised drawings for review. Make necessary <br />changes and deliver to Architect one set of reproducibles and one electronic copy, <br />including and BIM model, upon Final Completion and Acceptance. Refer to <br />Division 01 for additional requirements. <br />4. Provide full size copies of record one -line diagrams, in metal frames with glass <br />front. Obtain Record prints from Owner's Representative at Contractor's cost and <br />have prints framed by a firm normally engaged in this work. Locate diagrams as <br />directed. <br />5. All test reports, certifications, and inspection reports. <br />6. AHJ/Specialty AHJ Approvals (i.e., Fire Marshal and/or Fire Department system <br />approvals). <br />7. Substantial and Final inspection certificate signed by governing authorities. <br />8. All other items as may be specified/required by this Section and/or other provisions <br />of the Contract Documents. <br />1.6 EQUIPMENT DEVIATIONS AND SUBSTITUTIONS <br />A. See Division 01 for requirements and procedures related to Deviations and Substitutions. <br />Unless specified elsewhere in the Contract Documents, a minimum of two (2) weeks shall <br />be allowed for evaluation. The burden of all systems re-engineering/design, testing, <br />suitability and constructability is solely placed upon the Contractor for all deviations from <br />the basis of design as reflected in the Contract Documents. <br />B. No substitutions will be allowed and/or considered unless the description of a product <br />includes the phrase "approved equal" and then only upon a determination as to equivalency <br />and impact upon the project budget, schedule and the work of others, including any <br />redesign of the project or its system components by the Architect, Engineer or other trades. <br />The final determination as to sufficiency or acceptance of any such substitution and/or <br />deviation properly requested and submitted by Contractor will lie solely with the <br />Architect/Engineer. Contractor may not implement substitutions that have not been <br />approved by Architect/Engineer. <br />BASIC ELECTRICAL REQUIREMENTS 2601 00 - 7 <br />