Laserfiche WebLink
City of Everett <br />Development and Construction <br />Public Works - Permit Services <br />March 28, 2019 <br />CfYT) <br />We would be pleased to meet with you in person or discuss this by phone. <br />Thank you for your consideration. <br />Douglas McNutt Principal <br />Encl: Design Sketch Drawings SD2.01(new work), SD2.02 (existing), SD2.03(over-all <br />building). <br />Randy Olsen Sr. Construction Manager Kaiser Permanente <br />R. David Frum, FAIA, ACHA <br />Z \18044 - EVM Pharmacy Upgrade\Documents\04 50 Second Floor Door\Kaiser Everett Clinic 2nd Floor cross-comdor door 3-28-2019 docx <br />