My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
>
Address Records
>
MAPLE ST
>
2930
>
KAISER PERMANENTE
>
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2025 8:59:13 AM
Creation date
3/7/2025 2:47:49 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Tenant Name
KAISER PERMANENTE
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett <br />Development and Construction <br />Public Works - Permit Services <br />March 28, 2019 <br />(7!z�) <br />1010.1.9.7 Delayed Egress: <br />1. The delay electronics of the delayed egress locking system shall deactivate upon <br />actuation of the sprinkler system <br />2. The delay electronics of the delayed egress locking system shall deactivate upon <br />loss of power controlling the lock <br />3. The delayed egress locking system shall have the capability of being deactivated <br />at the fire command center. <br />4. An attempt to egress shall initiate an irreversible process that shall allow such <br />egress in not more than 15 seconds when a physical effort to exit is applied to the <br />egress side door hardware for not more than 3 seconds. Initiation of the <br />irreversible process shall activate an audible signal in the vicinity of the door. <br />Once the delay electronics have been deactivated, rearming the delay electronics <br />shall be by manual means only. <br />Exemption to #4: Where approved, a delay of not more than 30 seconds is <br />permitted on a delay egress door. <br />5. The egress path shall not pass thru more than one delayed egress system. <br />6. A sign shall be provided on the door located above and within 12" of the door exit <br />hardware. <br />6.1 For doors that swing in the direction of egress, the sign shall read: PUSH <br />UNTIL ALARM SOUNDS. DOOR CAN BE OPENED IN 15 (30) SECONDS. <br />6.2 The sign shall comply with the visual character requirements in ICC A117.1. <br />Summery: <br />1. We believe we meet the requirements for a delayed egress door at the end of the <br />75-foot dead-end corridor as listed above. We request you review this and verify <br />this approach will be acceptable to the City of Everett. <br />2. We request the 30-second delay rather than the 15 second delay per <br />Section1010.1.9.7 Delayed Egress Exception to item #4 as: <br />- The corridor serves only (7) offices where providers will be seeing <br />patients. These patients will always be with a provider who can direct the <br />patient in case the office area needs to evacuate. <br />- There will be no incapacitated patients, all can function without <br />assistance. <br />- Given the low volume of staff and only fully functional patients in this area, <br />we believe a 30-second delay door should be acceptable for this egress <br />door. <br />
The URL can be used to link to this page
Your browser does not support the video tag.