My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
>
Address Records
>
MAPLE ST
>
2930
>
KAISER PERMANENTE
>
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2025 8:59:13 AM
Creation date
3/7/2025 2:47:49 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Tenant Name
KAISER PERMANENTE
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KAISER PERMANENTE Site Prep #1 Electrical Service <br />ASC & Clinic (HUB) March 18, 2020 <br />Everett, WA Project No. 19.05002.00 <br />B. Conditions: <br />1. Conform to all Bidding Requirements, General Conditions and Amendments to <br />the General Conditions, Supplementary Conditions and Special Conditions and <br />General Requirements, Division 01, which govern the work specified herein. <br />2. The Contractor is obligated to comply with the above in addition to the <br />requirements of this Section. <br />3. Modifications by this Section do not nullify any other portions of the above <br />referenced conditions. <br />C. Make complete mechanical installation, connecting to all equipment shown on the plans, <br />or called for in the specifications. Mechanical contractor to provide any additional extra <br />dampers and valves not shown on plans to obtain design criteria as required by the <br />balancing contractor. <br />D. Plans and Specifications: Plans and specifications shall be taken together. <br />1. Contractor shall provide all equipment, materials and work shown on the plans <br />and/or called for in these specifications. <br />2. Provide work specified and not indicated on plans, or work indicated on plans <br />and not specified, as though mentioned in both. <br />3. When discrepancies or conflicts occur within the documents, the Architect shall <br />determine which takes precedence and the Contractor shall perform the selected <br />requirement without additional cost. <br />E. Mechanical Drawings: <br />1. Mechanical drawings do not attempt to show all aspects of building construction, <br />which will affect the installation of mechanical systems. The mechanical <br />drawings are diagrammatic and do not intend to show all offsets and fittings that <br />may be required for a complete installation. Locations of equipment, pipes, <br />valves, traps, ductwork, etc. shown on the drawings, shall be followed as closely <br />as conditions will permit. Review all project drawings, including, but not limited <br />to, architectural, structural and electrical drawings; and coordinate with all trades <br />involved so there is no conflict with work of other trades and so Owner secures <br />best arrangement of work consistent with use of space. <br />2. Verify exact distances between points shown of drawings by actual measurement <br />at site, as no extra cost will be allowed for differences between actual <br />measurements and scaled measurements. <br />3. Changes in design, configuration, or location of equipment, piping, or ductwork, <br />advisable in the opinion of Contractor, shall be submitted to Architect for approval <br />before proceeding with work, with written assurance from other trades that such <br />changes will not interfere with their installation, nor cause any extra cost on their <br />part. Such changes shall be made at no additional cost to Owner. <br />4. Check location of all work of all trades and avoid interferences. Special attention <br />is called to the following items; conflicts shall be reported to Architect for decision <br />and direction: <br />a. Exact location of outlets shown on architectural details. <br />b. Location of suspended ceilings. <br />C. Location of ducts, grilles, pipes, and other mechanical equipment so <br />electrical outlets are clear of these items and in proper relation to same. <br />1.4 DEFINITIONS AND ABBREVIATIONS <br />A. Exposed, Exterior Installations: Exposed to view outdoors, or subject to outdoor ambient <br />temperatures and weather conditions. Examples include rooftop locations. <br />COMMON MECHANICAL MATERIALS AND METHODS 23 05 00 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.