Laserfiche WebLink
KAISER PERMANENTE Site Prep #1 Electrical Service <br />ASC & Clinic (HUB) March 18, 2020 <br />Everett, WA Project No. 19.05002.00 <br />B. Conditions: <br />1. Conform to all Bidding Requirements, General Conditions and Amendments to <br />the General Conditions, Supplementary Conditions and Special Conditions and <br />General Requirements, Division 01, which govern the work specified herein. <br />2. The Contractor is obligated to comply with the above in addition to the <br />requirements of this Section. <br />3. Modifications by this Section do not nullify any other portions of the above <br />referenced conditions. <br />C. Make complete mechanical installation, connecting to all equipment shown on the plans, <br />or called for in the specifications. Mechanical contractor to provide any additional extra <br />dampers and valves not shown on plans to obtain design criteria as required by the <br />balancing contractor. <br />D. Plans and Specifications: Plans and specifications shall be taken together. <br />1. Contractor shall provide all equipment, materials and work shown on the plans <br />and/or called for in these specifications. <br />2. Provide work specified and not indicated on plans, or work indicated on plans <br />and not specified, as though mentioned in both. <br />3. When discrepancies or conflicts occur within the documents, the Architect shall <br />determine which takes precedence and the Contractor shall perform the selected <br />requirement without additional cost. <br />E. Mechanical Drawings: <br />1. Mechanical drawings do not attempt to show all aspects of building construction, <br />which will affect the installation of mechanical systems. The mechanical <br />drawings are diagrammatic and do not intend to show all offsets and fittings that <br />may be required for a complete installation. Locations of equipment, pipes, <br />valves, traps, ductwork, etc. shown on the drawings, shall be followed as closely <br />as conditions will permit. Review all project drawings, including, but not limited <br />to, architectural, structural and electrical drawings; and coordinate with all trades <br />involved so there is no conflict with work of other trades and so Owner secures <br />best arrangement of work consistent with use of space. <br />2. Verify exact distances between points shown of drawings by actual measurement <br />at site, as no extra cost will be allowed for differences between actual <br />measurements and scaled measurements. <br />3. Changes in design, configuration, or location of equipment, piping, or ductwork, <br />advisable in the opinion of Contractor, shall be submitted to Architect for approval <br />before proceeding with work, with written assurance from other trades that such <br />changes will not interfere with their installation, nor cause any extra cost on their <br />part. Such changes shall be made at no additional cost to Owner. <br />4. Check location of all work of all trades and avoid interferences. Special attention <br />is called to the following items; conflicts shall be reported to Architect for decision <br />and direction: <br />a. Exact location of outlets shown on architectural details. <br />b. Location of suspended ceilings. <br />C. Location of ducts, grilles, pipes, and other mechanical equipment so <br />electrical outlets are clear of these items and in proper relation to same. <br />1.4 DEFINITIONS AND ABBREVIATIONS <br />A. Exposed, Exterior Installations: Exposed to view outdoors, or subject to outdoor ambient <br />temperatures and weather conditions. Examples include rooftop locations. <br />COMMON MECHANICAL MATERIALS AND METHODS 23 05 00 - 2 <br />