My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
>
Address Records
>
MAPLE ST
>
2930
>
KAISER PERMANENTE
>
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2025 8:59:13 AM
Creation date
3/7/2025 2:47:49 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Tenant Name
KAISER PERMANENTE
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KAISER PERMANENTE <br />ASC & Clinic (HUB) <br />Everett, WA <br />1.8 SUBMITTALS, GENERAL REQUIREMENTS <br />Site Prep #1 Electrical Service <br />March 18, 2020 <br />Proiect No. 19.05002.00 <br />A. General: Follow the procedures for submittals or as described herein and specified in <br />Division 01. <br />B. General Requirements for Submittals: Provide the following submittals as indicated in <br />each section. Additional submittal requirements may be included in the individual <br />sections. <br />1. Product Data: Submit manufacturer's product data for the items listed in the <br />individual sections. Product data shall demonstrate compliance with all specified <br />features and requirements. Submittals for equipment shall include, but not be <br />limited to, data indicating equipment capacity meets the indicated values at <br />specified conditions, equipment drawings indicating all dimensions, connection <br />information, service space requirements, recommended piping and/or wiring <br />diagrams, installation details and extended warranties either offered by <br />equipment manufacturer or required by specifications. <br />2. Shop Drawings: Submit Contractor prepared drawings of Contractor fabricated <br />mechanical systems. Drawings shall be prepared at '/4" scale using Computer <br />Aided Design (CAD) software unless indicated otherwise. Drawings shall show <br />exact location of equipment, piping and ductwork, each section of shop <br />fabricated duct or pipe and location of field joints, supports and building <br />attachments, and seismic restraint locations. <br />3. Reports and Certificates: Indicate and interpret test results for compliance with <br />performance requirements. Provide performance certificates. <br />4. Operation and Maintenance Data: Submit proposed Operation and Maintenance <br />materials for approval prior to inclusion in the comprehensive final bound edition. <br />See Article in this section on Operation and Maintenance Manuals for materials <br />required to be included. <br />C. Format: Provide submittals arranged with numerical index and bookmarks in PDF <br />electronic format containing the total volume of material. All product data shall be <br />submitted complete by system, partial submittals are not acceptable and may be returned <br />unreviewed. Systems are defined here as plumbing systems (Division 22), fire <br />suppression system (Division 21) HVAC system, and HVAC control system (Division 23). <br />Reference submittals, including title and location of project, Architect, Contractor, <br />submission date, and specification paragraph number to indicate clearly the location, <br />service, equipment identification numbers as shown on drawings, and function of each <br />particular item. Where manufacturers' catalogs, pamphlets, or data sheets are submitted <br />in lieu of prepared shop drawings, such submissions shall indicate specifically the item <br />for which approval is required in red ink, and submissions showing general information <br />only are not acceptable. <br />D. Submittals not in conformance to above paragraphs will be returned unreviewed <br />1.9 SUBMITTALS, BASIC MECHANICAL MATERIALS <br />A. General: See Article in this section, Submittals, General Requirements for general <br />requirements of Product Data, Shop Drawings, Reports and Certificates, and Operation <br />and Maintenance data submittals. <br />B. Shop Drawings: None required. <br />C. Reports and Certificates: None required. <br />1.10 COORDINATION DRAWINGS <br />A. Detail major elements, components, and systems of mechanical equipment and materials <br />in relationship with other systems, installations, and building components. Show space <br />COMMON MECHANICAL MATERIALS AND METHODS 23 05 00 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.