Laserfiche WebLink
BORING LOG NO. B-07-19 Page 2 of 2 <br /> PROJECT: Kaiser Everett Medical Center CLIENT: Kaiser Permanente <br /> Renton,WA <br /> SITE: 2930 Maple Street <br /> Everett,WA <br /> 00 LOCATION See Exploration Plan w Z a ` F o W <br /> O o z <br /> U LL <br /> Latitude:47.977'Longitude:-122.1918' _ ¢ W L D w z <br /> x <br /> LL a wLu 0 > �� g ¢F w <br /> Surface Elev.:50(Ft.) o LU <br /> m Q C) L x U) 0 w <br /> DEPTH ELEVATION Ft. O LL <br /> SANDY SILT(ML),yellow to grayish brown,wet,hard,thin sand interbeds, X 28-44-50/3" <br /> low plasticity(continued) 15 N=50/3" S-7 <br /> 28.0 22 <br /> SILTY SAND WITH GRAVEL(SMI,yellowish brown to tannish brown, <br /> moist,very dense <br /> m <br /> N • :i 3 4 50/4" S-8 <br /> N=50/4" <br /> a <br /> O <br /> d ' <br /> W <br /> J <br /> W <br /> O :► <br /> a <br /> a ' @S-9,grayish brown,trace rock fragment 3 5 50/5" S 9 <br /> W' ' ' N=50/5" <br /> W <br /> W <br /> w <br /> a ' <br /> Y <br /> r <br /> D. 40.4 9.5 4 5 50/51, S-10 <br /> Refusal at 40.4 Feet N=50/5" <br /> J <br /> W <br /> O <br /> z <br /> 0 <br /> 0 <br /> J <br /> O <br /> W <br /> H <br /> 0 <br /> O <br /> W <br /> Z <br /> 2 <br /> X <br /> O <br /> 2 <br /> O <br /> X <br /> LL <br /> W <br /> Stratification lines are appro)dmate.In-situ,the transition may be gradual. Hammer Type: Automatic(ETR=86%) <br /> W <br /> w <br /> LLAdvancement Method: See Exploration and Testing Procedures for a Notes: <br /> o Hollow-Stem Auger description of Feld and laboratory procedures used <br /> and additional data(If any). <br /> � See Supporting Information for explanation of <br /> z Abandonment Method: symbols and abbreviations. <br /> co Boring backfilled with bentonite <br /> 0 Surface capped with concrete <br /> O <br /> J WATER LEVEL OBSERVATIONS <br /> 0 Boring Started:05-31-2019 Boring Completed:05-31-2019 <br /> While sampling IrerraccinO Drill Rig:D-90 Driller:Holocene <br /> m <br /> 21905 64th A%e W,Ste 100 <br /> Mountlake Terrace,WA Project No.:81195071 <br />