Laserfiche WebLink
BORING LOG NO. B-08-19 Page 1 of 1 <br /> PROJECT: Kaiser Everett Medical Center CLIENT: Kaiser Permanente <br /> Renton,WA <br /> SITE: 2930 Maple Street <br /> Everett,WA <br /> LOCATION See Exploration Plan w Z 0- v F w <br /> U o z <br /> O ILL <br /> Latitude:47.9772°Longitude:-122.1913° LuQ ~ LuW LU w z <br /> x <br /> o_ a LU <br /> w Lu� a > �U) g QF w <br /> Surface Elev.:48(Ft.) o ¢m Q 0 � ua) O x <br /> DEPTH ELEVATION(Ft.) U U a <br /> ASPHALT <br /> GGREGATE BASE COURSE <br /> FILL-SILTY SAND(Sl trace gravel,yellowish brown to tannish brown, <br /> moist,medium dense,(FILL/REWORKED GLACIAL TILL) <br /> : 3.0 @S-1,trace rock fragment 45 13 7 23 23 S 1 <br /> o SILTY SAND WITH GRAVEL ll yellowish brown to tannish brown, N=46 <br /> moist,very dense,(GLACIAL TILL) <br /> 5 <br /> N ! @S-2,trace rock fragment 18 3-23-21 S 2 <br /> a N=44 <br /> � . <br /> o_ <br /> w :i <br /> w : @S-3,trace rock fragment,fine to medium grained sand at 9"from bottom 13-30-27 <br /> 18 S-3 <br /> o obstruction,possibly cobbles or boulders N=57 <br /> a ' <br /> 0 <br /> 10— <br /> m 0 " <br /> no recovery 50/1 S-4 <br /> w� <br /> Owe <br /> > , hard drilling,denser till <br /> w • <br /> Of <br /> w <br /> a ' <br /> Y ' 32-50/5" <br /> 14.9 33 11 N=50/5" S-5 <br /> Refusal at 14.9 Feet <br /> >J <br /> 0 <br /> Z <br /> 0 <br /> 0 <br /> J <br /> Q <br /> N <br /> 0 <br /> H <br /> 0 <br /> w <br /> Q <br /> Z_ <br /> U' <br /> X <br /> O <br /> 2 <br /> O <br /> of <br /> ILL <br /> w <br /> ¢ Stratification lines are appropmate.In-situ,the transition may be gradual. Hammer Type: Automatic(ETR=86%) <br /> Q <br /> w <br /> w <br /> N Advancement Method: Notes: <br /> w See Exploration and Testing Procedures for a <br /> o Hollow-Stem Auger description of Feld and laboratory procedures used <br /> a and additional data(If any). <br /> rSee Supporting Information for explanation of <br /> O Abandonment Method: symbols and abbreviations. <br /> Boring backfilled with bentonite <br /> Surface capped with concrete <br /> O <br /> J WATER LEVEL OBSERVATIONS <br /> z Boring Started:05-31-2019 Boring Completed:05-31-2019 <br /> Ix <br /> Groundwater not encountered Irerracon Drill Rig:D-90 Driller:Holocene <br /> °m <br /> 21905 64th Ave W,Ste 100 <br /> F Mountlake Terrace,WA Project No.:81195071 <br />